Closed Solicitation · DEPARTMENT OF TRANSPORTATION

    Lowell National Historical Park, Passenger Platforms Replacement and Track Repair Work

    Sol. 6913G626Q300004SolicitationSet-aside: Total Small Business Set-Aside (FAR 19.5)CAMBRIDGE, MA
    Closed
    STATUS
    Closed
    closed Dec 15, 2025
    POSTED
    Dec 11, 2025
    Publication date
    NAICS CODE
    237990
    Primary industry classification
    PSC CODE
    C1LB
    Product & service classification

    AI Summary

    The Lowell National Historical Park is seeking a contractor for the replacement of passenger platforms and repair of trolley tracks. This project involves labor, materials, and equipment to enhance the trolley system, which is essential for maintaining its operational integrity. Bidders should be prepared to address critical component renewals and preventative maintenance activities.

    Contract details

    Solicitation No.
    6913G626Q300004
    Notice Type
    Solicitation
    Set-Aside
    Total Small Business Set-Aside (FAR 19.5)
    Posted Date
    December 11, 2025
    Response Deadline
    December 15, 2025
    NAICS Code
    237990AI guide
    PSC / Class Code
    C1LB
    Contract Code
    6901
    Primary Contact
    Carl Chin
    State
    MA
    ZIP Code
    02142
    AI Product/Service
    both

    Description

    Lowell National Historical Park’s (LNHP’s) 2-mile trolley system has been in operation for 30 years in its current form. The trolley system is a small remnant of the historic trolley system from the era of the mills at the LNHP site. While the trolley system is currently in a general state of good repair, portions of the trolley system are reaching their end-of-life in which critical component renewals will be needed in addition to enhanced preventative maintenance activities. The Contractor shall provide all labor, material, tools, and equipment to repair trolley tracks in way of four passenger platforms [Swamp Locks Station, Mack Plaza Station (Visitor Center), Moody Street Feeder House Station, and Suffolk Station]; replace ties from the heel block at switch to the last line tie (Suffolk to Wye track section); replace platforms, including all supporting structure, at each station; and replace the wood fence at Mack Plaza Station.

    Key dates

    1. December 11, 2025Posted Date
    2. December 15, 2025Proposals / Responses Due

    AI search tags

    Frequently asked questions

    Lowell National Historical Park, Passenger Platforms Replacement and Track Repair Work is a federal acquisition solicitation issued by DEPARTMENT OF TRANSPORTATION. Review the full description, attachments, and submission requirements on SamSearch before the response deadline.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.