Closed Solicitation · DEPARTMENT OF ENERGY

    Main Ring Electrical P-F3 to P-F4 15KV Cable Installation, FESS Project 3-7-103B

    DEPARTMENT OF ENERGY
    Sol. 375108-CDSolicitationSet-aside: Total Small Business Set-Aside (FAR 19.5)Batavia, IL
    Closed
    STATUS
    Closed
    closed Dec 17, 2025
    POSTED
    Dec 11, 2025
    Publication date
    NAICS CODE
    237130
    Primary industry classification
    PSC CODE
    Z1PZ
    Product & service classification

    AI Summary

    The Department of Energy is soliciting proposals for the installation of 15KV cable from P-F3 to P-F4 as part of the FESS Project 3-7-103B. The subcontractor will provide all necessary labor, materials, and equipment. Amendments have been issued to extend the proposal due date and provide revised documents. Proposals are due by 4pm CT on December 17, 2025.

    Contract details

    Solicitation No.
    375108-CD
    Notice Type
    Solicitation
    Set-Aside
    Total Small Business Set-Aside (FAR 19.5)
    Posted Date
    December 11, 2025
    Response Deadline
    December 17, 2025
    NAICS Code
    237130AI guide
    PSC / Class Code
    Z1PZ
    Contract Code
    8900
    Primary Contact
    Chris Daley
    State
    IL
    ZIP Code
    60510
    AI Product/Service
    service

    Description

    On 12/11/2025, Amendment 03 was issued to extend the proposal due date to 4pm CT on December 17, 2025. See atatched file for more information. On 12/4/2025, Amendment 02 was issued to provide REVISED responses to some questions issued in Amendment 01, replaced the Revised Exhibit R- Proposal Form issued with Amenment 01, and Replaced Revised Drawing No.'s 3-7-103-B_E-5 and 3-7-103-B_E-10 issued in Amenment 01 with new revised drawings. See attached files for more information. On 12/4/2025, Amendment 01 was issued to Replace Exhibit R- Proposal form, Replace Drawing No.'s 3-7-103-B_E-1A, 3-7-103-B_E-5, and 3-7-103-B_E-10 with Revised drawings, and to provide responses to questions from prospective offerors. See atatched files for more information. The Subcontractor shall furnish all labor, materials, transportation, overhead, insurance, bonding costs, safety oversight, quality control oversight, supervision, and equipment necessary to perform the work described in the Statement of Work entitled, “P-F3 to P-F4 15 KV Cable Install, Project 3-7-103B” dated November 3, 2025 and Drawing Set entitled “P-F3 to P-F4, 15KV Cable Installation, Project No. 3-7-103B, dated October 2025, Specification Sections 010010 – General Requirements (March 2025), Section 013100 FRA Environment, Safety, and Health Requirements (April 2025), Section 013300 – Submittals (January 2025), Section 014100 – Quality Requirements (October 2025), mentioned therein, which the specifications, drawings, and other documents are attached to and hereby made a part of this Solicitation.

    Key dates

    1. December 11, 2025Posted Date
    2. December 17, 2025Proposals / Responses Due

    AI search tags

    Frequently asked questions

    Main Ring Electrical P-F3 to P-F4 15KV Cable Installation, FESS Project 3-7-103B is a federal acquisition solicitation issued by DEPARTMENT OF ENERGY. Review the full description, attachments, and submission requirements on SamSearch before the response deadline.