Active Solicitation · DEPT OF DEFENSE

    MAINTENANCE DREDGING, KENNEBEC RIVER, KENNEBEC MAINE

    Sol. W912WJ26BA015SolicitationCONCORD, MA
    Open · 35d remaining
    DAYS TO CLOSE
    35
    closes Jul 28, 2026
    POSTED
    Jun 15, 2026
    Publication date
    NAICS CODE
    237990
    Primary industry classification
    PSC CODE
    Y1QA
    Product & service classification

    AI Summary

    The opportunity involves maintenance dredging of the Kennebec River to support navigational requirements for newly constructed surface combatants. The project includes dredging approximately 80,000 cubic yards of material from specified areas and is expected to take 3-4 weeks, with a work window from December 2026 to February 2027.

    Contract details

    Solicitation No.
    W912WJ26BA015
    Notice Type
    Solicitation
    Posted Date
    June 15, 2026
    Response Deadline
    July 28, 2026
    NAICS Code
    237990AI guide
    PSC / Class Code
    Y1QA
    Primary Contact
    Elizabeth Glasgow
    State
    MA
    ZIP Code
    01742-2751
    AI Product/Service
    service

    Description

    Maintenance Dredging, Kennebec River, Kennebec Maine. The work involves maintenance dredging for the USN of three portions of the authorized, 27-foot deep, 500-foot wide FNP in the Lower Kennebec River. Dredging is required to meet the navigational requirements of newly constructed surface combatants being built and tested at Bath Iron Works (BIW). The proposed work consists of dredging approximately 80,000 cubic yards (cy) of clean sand (approximately 30,000 cy of required material and 50,000 cy of overdepth (OD) material). Approximately 61,000 cy of material will be removed from the Doubling Point area (i.e., just below Bath), and approximately 10,000 cy of material will be removed from the Popham Beach area (at the river mouth). In addition to the historically dredged sites, this proposed maintenance dredging includes dredging approximately 9,000 cy of material will be removed from Bath Reach (just below the Carlton Bridge and adjacent to BIW). As part of this proposal, maintenance dredging will be performed to remove the sand-waves in the vicinity of Doubling Point to an elevation of -32 feet MLLW +2 feet overdepth (OD) to improve the chance that adequate depths will endure. The 61,000 cy to be removed from the channel at Doubling Point includes dredging to an elevation of -32 feet MLLW +2 feet OD. Material dredged from the Bath Reach area and the Doubling Point area will be placed in the previously used in-river disposal area north of Bluff Head in about 45-90 feet of water. Material dredged from the Popham Beach area will be placed at a newly established nearshore placement site called Jackknife Ledge West Disposal Site, in about 45-30 feet of water. This site is just northwest of the previously used Jackknife Ledge placement site. The dredging and dredged material placement work is expected to take 3-4 weeks to complete. The available work window for the dredging and placement of dredged material is from 1 December 2026 to 15 February 2027.

    Key dates

    1. June 15, 2026Posted Date
    2. July 28, 2026Proposals / Responses Due

    AI search tags

    Frequently asked questions

    MAINTENANCE DREDGING, KENNEBEC RIVER, KENNEBEC MAINE is a federal acquisition solicitation issued by DEPT OF DEFENSE. Review the full description, attachments, and submission requirements on SamSearch before the response deadline.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.