    The U.S. Army Corps of Engineers is seeking contractors for maintenance dredging of the Bronx River, NY, involving the removal of approximately 200,000 cubic yards of sand and silt. Dredged material will be transported to the Historic Area Remediation Site using large-capacity ocean-going scows. Contractors must maintain a minimum daily production of 8,000 cubic yards and adhere to an environmental no-work window from January 1 to September 30. This is an unrestricted procurement opportunity.

    Contract details

    Solicitation No.
    W912DS25BA015
    Notice Type
    Solicitation
    Posted Date
    July 3, 2025
    Response Deadline
    July 28, 2025
    NAICS Code
    237990AI guide
    PSC / Class Code
    Y1KZ
    Issuing Office
    W2SD ENDIST NEW YORK
    Primary Contact
    Matthew Lubiak
    State
    NY
    ZIP Code
    10278-0004

    Description

    The New York District of the U.S. Army Corps of Engineers (USACE) proposes to perform maintenance dredging of the Bronx River, NY Federal Channel. The dredged material would be dredged and subsequently placed at the Historic Area Remediation Site (HARS), approximately four (4) miles east of Sandy Hook, New Jersey. Placement at the HARS requires the contractor to utilize large-capacity ocean-going scows. The proposed maintenance dredging would remove approximately 200,000 cubic yards of dredged material from the Bronx River. Dredging would be required to a depth of -10 feet plus one (1) feet allowable over depth. The dredged material consists primarily of sand and silt. It is anticipated that miscellaneous marine debris will be encountered during dredging operations. This debris will need to be appropriately removed and disposed of at a contractor furnished disposal facility.

    Once the contract is awarded, the proposed contractor will be required to maintain minimum daily production of 8,000 CY with the use of a mechanical "clamshell" bucket. The anticipated environmental no-work window is from January 01 to September 30. The period of performance will begin once the Notice to Proceed is issued and acknowledged by the Contractor. Failure to complete the work within the period of performance, including contract modifications, will result in the Contractor paying liquidated damages. 

    This is an unrestricted procurement.

    Key dates

    1. July 3, 2025Posted Date
    2. July 28, 2025Proposals / Responses Due

    Frequently asked questions

    MAINTENANCE DREDGING OF BRONX RIVER, NY, FEDERAL NAVIGATION PROJECT is a federal acquisition solicitation issued by DEPT OF DEFENSE. Review the full description, attachments, and submission requirements on SamSearch before the response deadline.