Closed Solicitation · DEPARTMENT OF AGRICULTURE

    MALHEUR NATIONAL FOREST TRAIL MAINTENANCE

    Sol. 1240BK25Q0092Combined Synopsis/SolicitationSet-aside: Total Small Business Set-Aside (FAR 19.5)PORTLAND, OR
    Closed
    STATUS
    Closed
    closed Sep 29, 2025
    POSTED
    Sep 23, 2025
    Publication date
    NAICS CODE
    561730
    Primary industry classification
    PSC CODE
    F999
    Product & service classification

    AI Summary

    This opportunity involves trail maintenance within the Strawberry Mountain Wilderness area of the Malheur National Forest. Contractors are required to perform logout and brushing on specified trail segments, ensuring compliance with USFS standards. The work includes clearing debris, managing vegetation, and addressing safety concerns related to downed trees.

    Contract details

    Solicitation No.
    1240BK25Q0092
    Notice Type
    Combined Synopsis/Solicitation
    Set-Aside
    Total Small Business Set-Aside (FAR 19.5)
    Posted Date
    September 23, 2025
    Response Deadline
    September 29, 2025
    NAICS Code
    561730AI guide
    PSC / Class Code
    F999
    Sub-Agency
    FOREST SERVICE
    Primary Contact
    Kevin Flores
    State
    OR
    ZIP Code
    97205
    AI Product/Service
    service

    Description

    This requirement is for trail maintenance to be performed within and adjacent the Strawberry Mountain Wilderness area in the Malheur National Forest. Lines items involve logout and brushing of eight wilderness trail segments and five non-wilderness trail segments. The Contractor shall furnish the necessary personnel, supervision, material, equipment, facilities, services, supplies, travel, transportation, training, and incidentals to perform deferred trail maintenance. The line items require logout and brushing on the trail segments based on USFS standards (Reference Exhibits 1-7). This includes all downed and leaning trees, brushing of woody type vegetation encroaching on the trail corridor, and general clearing of debris from trail beds. Brushing is 4 feet from centerline of trail, 10 feet high. Clearing of down logs is the same, in addition to hazard trees. Cut stubs to avoid safety concerns – where possible cut to ground level. Trails shall be cleared to standard trail clearing specifications. Whitebark pine within trail clearing limits have special specifications shown in technical requirements.

    Key dates

    1. September 23, 2025Posted Date
    2. September 29, 2025Proposals / Responses Due

    AI search tags

    Frequently asked questions

    MALHEUR NATIONAL FOREST TRAIL MAINTENANCE is a federal acquisition solicitation issued by DEPARTMENT OF AGRICULTURE. Review the full description, attachments, and submission requirements on SamSearch before the response deadline.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.