Closed Solicitation · DEPT OF DEFENSE

    MARKET RESEARCH - AIR TRAFFIC CONTROL TOWER, WARNER ROBINS, AFB

    Sol. W912HN26BA007Sources SoughtSAVANNAH, GA
    Closed
    STATUS
    Closed
    closed May 13, 2026
    POSTED
    Apr 29, 2026
    Publication date
    NAICS CODE
    236220
    Primary industry classification
    PSC CODE
    Y1BA
    Product & service classification

    AI Summary

    The U.S. Army Corps of Engineers is conducting market research for a potential Small Business Set-Aside to construct an Air Traffic Control Tower at Robins Air Force Base, Georgia. The project includes reinforced concrete foundations, structural steel framing, and various functional areas. Responses to the survey are due by April 30, 2026.

    Contract details

    Solicitation No.
    W912HN26BA007
    Notice Type
    Sources Sought
    Posted Date
    April 29, 2026
    Response Deadline
    May 13, 2026
    NAICS Code
    236220AI guide
    PSC / Class Code
    Y1BA
    Issuing Office
    W074 ENDIST SAVANNAH
    Primary Contact
    Greg Graham
    State
    GA
    ZIP Code
    31401-3604
    AI Product/Service
    both

    Description

    The U.S. Army Corps of Engineers (USACE), Savannah District, is conducting market research in regard to a potential Small Business Set-Aside for the construction of an Air Traffic Control Tower under NAICS 236220 - Commercial and Institutional Building Construction with a size standard of $45M. The project will be located at Robins Air Force Base, Georgia.

    Scope Summary - Construct a new Air Traffic Control Tower consisting of reinforced concrete foundations and footings, brick veneer and insulated metal panel exterior walls, load-bearing masonry for the ground floor and structural steel frame for the tower and sloped standing seam metal roof. Functional areas include offices for personnel, training and briefing area, ready/breakroom, simulator room, elevator, mechanical/electrical/communications rooms, storage area, restrooms, and control cab. The new facility will include appropriate power, 750KW backup generator, heating ventilation and air conditioning, fire and lighting protection, and communications systems. The project includes all utilities, site preparation, site improvements, pavements, and all necessary work for a complete and usable facility.

    Please complete the survey at the link below and submit responses no later than 30 April 2026.

    Link: https://forms.osi.apps.mil/r/nTBbghTztp

    Key dates

    1. April 29, 2026Posted Date
    2. May 13, 2026Proposals / Responses Due

    AI search tags

    Frequently asked questions

    MARKET RESEARCH - AIR TRAFFIC CONTROL TOWER, WARNER ROBINS, AFB is a federal acquisition solicitation issued by DEPT OF DEFENSE. Review the full description, attachments, and submission requirements on SamSearch before the response deadline.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.