Active Solicitation · DEPT OF DEFENSE
AI Summary
The project involves the demolition and renovation of the Fuel Laboratory Facility 9647 at MCAS Miramar. It includes environmental considerations such as hazardous materials survey and abatement to prevent pollution during construction. Interested contractors should be aware of the environmental protections required throughout the project.
This project consists of demolition and construct/renovate the Fuel Laboratory Facility 9647 (CLIN 0001). The existing structure is in relatively good condition, therefore the building will be completely renovated. Environmental considerations of this project includes demolition with hazardous building materials survey and abatement. Prevent environmental pollution and damage that may occur as a result of construction operations. The environmental resources within the project boundaries and those affected outside the limits of permanent work must be protected during the entire duration of this contract.
MCAS MIRAMAR FUELS LAB CONSTRUCT is a federal acquisition solicitation issued by DEPT OF DEFENSE. Review the full description, attachments, and submission requirements on SamSearch before the response deadline.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.