    This pre-solicitation notice is for the construction of a new water tower and associated infrastructure in Midwest City, Oklahoma. The project includes a 500,000-gallon elevated storage tank, a high service pump station, and various piping works. The estimated construction cost ranges from $10 million to $25 million, with a proposal due date anticipated around July 23, 2026.

    Contract details

    Solicitation No.
    W912BV26RA027
    Notice Type
    Presolicitation
    Posted Date
    June 9, 2026
    Response Deadline
    NAICS Code
    237110AI guide
    PSC / Class Code
    Y1NE
    Issuing Office
    W076 ENDIST TULSA
    Primary Contact
    Tyler Godwin
    City
    TULSA
    State
    OK
    ZIP Code
    74137-4290
    AI Product/Service
    service

    Description

    Pre-solicitation Notice

    For

    MIDWEST CITY WATER TOWER

    Midwest City, Oklahoma County, Oklahoma

    This is a PRE-SOLICITATION NOTICE for the construction of a Water Tower and associated infrastructure for Midwest City, Oklahoma. THIS IS NOT A SOLICITATION FOR PROPOSALS AND NO CONTRACT WILL BE AWARDED FROM THIS SYNOPSIS.  No reimbursement will be made for any costs associated with providing information in response to this pre-solicitation notice or any follow up postings.

    The U.S. Army Corps of Engineers – Tulsa District has been tasked to solicit for and award a contract to construct a new water tower for Midwest City, Oklahoma. The proposed design-bid-build project will be procured as an unrestricted, firm-fixed price contract in accordance with FAR 15, Negotiated Procurement, using the Lowest Price Technically Acceptable approach. Tradeoffs will not be permitted.

    Project Description:

    Midwest City (MWC)is developing a high-pressure zone to improve the low pressures within the southeastern portion of the water distribution system (WDS) and proposed improvements that include the following, and incidental related work:

    1. Construction of a new 500,000-gallon elevated storage tank (EST), including associated piping, electrical, controls, and site improvements.
    2. Construction of a new high service pump station (HSPS), including associated piping, electrical, controls, and site improvements. Work includes shoring and dewatering practices as required, and as indicated in the Contract Documents.
    3. Construction of approximately 650 linear feet of new 12-inch ductile iron pipe from the new EST access road to the existing pipe connection on Timber Ridge Blvd. Work includes all pipe fittings, valves, restraints, traffic control, and site repairs.
    4. Work to complete the piping reconfiguration at the existing Titan Tower Tank site, including approximately 100 linear feet of 18-inch ductile iron pipe, 80 linear feet of 16-inch ductile iron pipe, pipe appurtenances, and pipe reconnections.
    5. Reconfiguration of distribution system piping at the corner of 15th Street and Westminster Road, including a new connection from the 24-inch water main on the west side of Westminster Road to the 12-inch water main on the north side of 15th Street.
    6. All erosion and sediment control devices, device maintenance, construction stormwater permitting, and stormwater management throughout construction.
    7. Close required isolation valves to isolate the Timber Ridge Zone while coordinating the valve work with the Owner.

    The estimated magnitude of construction for this project is between $10,000,000 and $25,000,000.

    The North American Industry Classification System code for this procurement 237110 (Water and Sewer Line and Related Structures Construction) which has a small business size standard of $45M.

    The Product Service Code is: Y1NE (Construction of Water Supply Facilities)

    Estimated duration of construction of this project is 450 calendar days.

    Anticipated solicitation issuance date is on or about 23 June 2026, and the estimated proposal due date will be on or about 23 July 2026.

    Key dates

    1. June 9, 2026Posted Date

    AI search tags

    Frequently asked questions

    MIDWEST CITY WATER TOWER is a federal acquisition solicitation issued by DEPT OF DEFENSE. Review the full description, attachments, and submission requirements on SamSearch before the response deadline.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.