Closed Solicitation · DEPT OF DEFENSE

    MONUMENT REHABILITATION AT PIEDMONT DAM

    Sol. W9123725QA075Combined Synopsis/SolicitationSet-aside: Total Small Business Set-Aside (FAR 19.5)PITTSBURGH, PA
    Closed
    STATUS
    Closed
    closed Sep 22, 2025
    POSTED
    Sep 19, 2025
    Publication date
    NAICS CODE
    238110
    Primary industry classification
    PSC CODE
    S208
    Product & service classification

    AI Summary

    The Department of Defense is seeking contractors for the rehabilitation of a monument at Piedmont Dam. The project includes removing and restoring a plaque, excavating for a new concrete pad, and constructing a new monument base. All work must adhere to specified dimensions and guidelines. Interested bidders should review the provided attachments for detailed requirements.

    Contract details

    Solicitation No.
    W9123725QA075
    Notice Type
    Combined Synopsis/Solicitation
    Set-Aside
    Total Small Business Set-Aside (FAR 19.5)
    Posted Date
    September 19, 2025
    Response Deadline
    September 22, 2025
    NAICS Code
    238110AI guide
    PSC / Class Code
    S208
    Primary Contact
    Aaron Barr
    State
    PA
    ZIP Code
    15222-4198
    AI Product/Service
    both

    Description

    The Contractor shall provide all labor, supplies, materials, and equipment to remove existing monument information plaque, restore information plaque, excavate area, form, pour and install new concrete pad, form and pour in place new monument base and re-install restored information plaque. The contractor shall excavate designated area as per Attachment 2. All excavated material shall be set aside for finish grading after pad and monument are complete. The area of excavation for the 20 x 20 pad as per Attachment 3 be deep enough to allow for a 6-inch thick 20 ft by 20 ft concrete pad to have a minimum of 5 inches of concrete below the ground level and 1 inch extending beyond ground level. The contractor shall place 3 inches of 304 aggregate under the 6-inch-deep pad prior to the pour of pad. The concrete pad shall have a 1 inch to 10 ft slope from side to side as indicated on Attachment 4. The contractor shall install 4x4 wire mesh and tie, for the entire formed pad area except in the location of proposed monument. The contractor shall construct a monument and base as per Attachment 6. The dimensions of the monument shall be field verified and relative to the Government Furnished Plaque. The contractor shall remove the existing bronze plaque from the concrete monument, thoroughly clean off all oxidation and corrosion as well as all paint on lettered portion or any other portion of plaque that is painted. The contractor shall have bronze plaque restored to a bright finish, all previously painted areas repainted black and entire bronze plaque will have 2 coats of clear sealer applied.**NOTICE** Information regarding the U.S. Army Corps of Engineers process for settling requests for equitable adjustments and duration goals to achieve definitization of equitable adjustments for change orders under construction contracts can be found by going to https://www.usace.army.mil/Business-With-Us/Partnering/ then clicking on ?View FFP Contract Changes Playbook Here?. 15 September 2025 - Amendment 0001 published to update Attachments 2,3,4, and 5, update Attachment 7 - Wage Determination ON20250001 from 9-5-2025 to 9-12-2025 and add Attachment 8 - Guideline for Historic Preservation.

    Key dates

    1. September 19, 2025Posted Date
    2. September 22, 2025Proposals / Responses Due

    AI search tags

    Frequently asked questions

    MONUMENT REHABILITATION AT PIEDMONT DAM is a federal acquisition solicitation issued by DEPT OF DEFENSE. Review the full description, attachments, and submission requirements on SamSearch before the response deadline.