Closed Solicitation · DEPT OF DEFENSE
AI Summary
The MOTCO Rail Curves Package 3 project involves the repair and replacement of approximately 2,500 linear feet of rail track, including ties, rails, and turnouts at the Military Ocean Terminal in Concord. The project includes options for UXO clearance and wetland mitigation. Interested bidders should refer to the attached amendment for further details.
** Amendment 0001 - See attached amendment for details.** ** Note - the table of contents in this solicitation attachment is incorrect. The attachments included in this PIEE solicitation post are the correct attachments for this requirement. A forthcoming amendment with the correct table of contents will be posted.**Scope of this project is the repair of approximately 2,500 LF by replacement, including repairs of ties, rails, turnouts, rail crossings and other track material for multiple rail curves on the tidal side of the installation at Military Ocean Terminal, Concord (MOTCO). The base bid package includes repair by replacement of curves 9 and 10 with curvature less than 12 degrees. Tracks will be constructed per standards in UFC 4-860-01FA and American Railway Engineering and Maintenance of Way Association (AREMA). The following work will be included as contract options:- UXO clearance and transportation,- UXO blow-in-place,- Mission stand down, - Wetland mitigation credit purchase
MOTCO Rail Curves Package 3 is a federal acquisition solicitation issued by DEPT OF DEFENSE. Review the full description, attachments, and submission requirements on SamSearch before the response deadline.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.