Closed Solicitation · DEPT OF DEFENSE

    MOUNT SAINT HELENS SEDIMENT RETENTION STRUCTURE CREST RAISE

    Sol. W9127N26BA004SolicitationPORTLAND, OR
    Closed
    STATUS
    Closed
    closed Dec 19, 2025
    POSTED
    Dec 12, 2025
    Publication date
    NAICS CODE
    237990
    Primary industry classification
    PSC CODE
    Y1QA
    Product & service classification

    AI Summary

    The U.S. Army Corps of Engineers is soliciting a firm-fixed price contract for the construction of a sediment retention structure on the North Fork Toutle River in Washington. The project includes mobilization, river diversion, rock excavation, and concrete placement. Interested contractors should refer to the updated specifications for further details.

    Contract details

    Solicitation No.
    W9127N26BA004
    Notice Type
    Solicitation
    Posted Date
    December 12, 2025
    Response Deadline
    December 19, 2025
    NAICS Code
    237990AI guide
    PSC / Class Code
    Y1QA
    Issuing Office
    W071 ENDIST PORTLAND
    Primary Contact
    Andrew Sprys
    State
    OR
    ZIP Code
    97204-3495
    AI Product/Service
    service

    Description

    ***12/05/25*** For project related CADD files, please reach out to me directly as this site does not support the file type: Andrew.j.sprys@usace.army.mil

    ***12/05/25*** The purpose of this amendment is to update specifications due to bidder inquiries. See Summary of changes. All other terms and conditions remain unchanged.

    SYNOPSIS

    The U.S. Army Corps of Engineers (USACE) Portland District is soliciting a Contract for the Mt. St. Helens Sediment Retention Structure Crest Raise on the North Fork Toutle River in Cowlitz County, Washington. The proposed project will be a competitive, firm-fixed price (FFP) contract.

    Description of Requirement: The U.S. Army Corps of Engineers, Portland District, has a requirement to construct an increased level of sediment retention structure providing additional storage and allowing existing river flows. The work includes mobilization/demobilization, river diversion, rock excavation, rock foundation preparation including placement of dental concrete, placement of roller-compacted concrete, outlet works sealing, and incidental related work. This effort is to include all associated works required and described within this Contract package.

    Purpose: The project purpose is to construct an increased level of sediment retention structure providing additional storage and allowing existing river flows. The work includes mobilization/demobilization, river diversion, rock excavation, rock foundation preparation including placement of dental concrete, placement of roller-compacted concrete, outlet works sealing, and incidental related work. This effort is to include all associated works required and described within this Contract package.

    The work will be located at the Sediment Retention Structure on the North Fork Toutle River in Cowlitz County, Washington, off of Highway 504. Contractor access to the work site will be from gravel access roads on the dam site, the gravel roadway on top of the embankment dam, the top of the concrete outlet works structure, and a paved roadway on the spillway approach pier west of the existing spillway crest.

    Key dates

    1. December 12, 2025Posted Date
    2. December 19, 2025Proposals / Responses Due

    AI search tags

    Frequently asked questions

    MOUNT SAINT HELENS SEDIMENT RETENTION STRUCTURE CREST RAISE is a federal acquisition solicitation issued by DEPT OF DEFENSE. Review the full description, attachments, and submission requirements on SamSearch before the response deadline.