Closed Solicitation · DEPT OF DEFENSE

    MVD STONE REQUIREMENTS FOR FY 25

    Special NoticeVICKSBURG, MS
    Closed
    STATUS
    Closed
    closed Sep 30, 2025
    POSTED
    Oct 25, 2024
    Publication date
    NAICS CODE
    237990
    Primary industry classification
    PSC CODE
    Y1PZ
    Product & service classification

    AI Summary

    The Department of Defense, specifically the Department of the Army, has issued a special notice regarding anticipated stone work requirements for Fiscal Year 2025 within the Mississippi Valley Division (MVD). This includes projects in the Memphis, Vicksburg, and New Orleans Districts, with the NAICS Code 237990. The notice outlines that the work will involve construction and repairs to various river training structures such as dikes, revetments, chevrons, and bendway weirs, as well as additional land-based construction activities like bank grading, excavation, and stone placement. It is important to note that all project details

    Contract details

    Notice Type
    Special Notice
    Posted Date
    October 25, 2024
    Response Deadline
    September 30, 2025
    NAICS Code
    237990AI guide
    PSC / Class Code
    Y1PZ
    Contract Code
    2100
    Issuing Office
    W07V ENDIST VICKSBURG
    Primary Contact
    Joelle Handy
    State
    MS
    ZIP Code
    39183-3435
    AI Product/Service
    service

    Description

    The intent of this special notice is to share the most current information available with respect to anticipated stone work requirements within the Mississippi Valley Division (MVD) in the Memphis (W912EQ), Vicksburg (W912EE), and New Orleans (W912P8) Districts during Fiscal Year 2025.

    NOTE: This information includes projected requirements and schedules that are subject to change. All project information is subject to change as designs are refined and impacts are quantified.

    Principle features of work include various construction and repairs to existing dikes, revetments, chevrons, bendway weirs, and other river training structures at various locations. Additional land-based construction may include bank grading and dressing, excavation, placement of crushed stone blanket, riprap upper bank paving, placement of stone fill and stone paving in specified areas such as dike fields, revetments, and other locations along top bank and in overbank areas landward of top bank. Repairs to existing structures may also be required.  This work may include removal and redistribution of stone from dikes, revetments and other areas, breaking out pavement, placing and painting range markers, and clearing range lines. This work will be performed in the Mississippi River; varying water depths and currents may be encountered.

    MEMPHIS DISTRICT

    Small Business Professional: Sherrie Cordi, (901) 544-4146

    Email: Sherrie.Cordi@usace.army.mil

    Internet: http://www.mvm.usace.army.mil/Business-With-Us/Small-Business/

    District Contracting Chief: Pricilla Sweeney

    Email: Priscilla.G.Sweeney@usace.army.mil

    VICKSBURG DISTRICT

    Small Business Professional: Demetric Erwin, (601) 631-5951

    Email: SBO-MVK@usace.army.mil

    Internet: http://www.mvk.usace.army.mil/Business-With-Us/Small-Business/

    District Contracting Chief: Davita Baloue

    Email: Davita.S.Baloue@usace.army.mil

    NEW ORLEANS DISTRICT

    Small Business Professional: David Willis, (504) 862-2627

    Email: David.Willis@usace.army.mil

    Internet: http://www.mvn.usace.army.mil/Business-With-Us/Small-Business/

    District Contracting Chief: Cynthia Hall

    Email: Cynthia.M.Hall@usace.army.mil

    Key dates

    1. October 25, 2024Posted Date
    2. September 30, 2025Proposals / Responses Due

    AI search tags

    Frequently asked questions

    MVD STONE REQUIREMENTS FOR FY 25 is a federal acquisition solicitation issued by DEPT OF DEFENSE. Review the full description, attachments, and submission requirements on SamSearch before the response deadline.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.