Closed Solicitation · DEPARTMENT OF TRANSPORTATION

    ND FLAP SDN 7NE(1) HOFFER LAKE ACCESS

    Sol. 6982AF25B000017PresolicitationSet-aside: Total Small Business Set-Aside (FAR 19.5)LAKEWOOD, CO
    Closed
    STATUS
    Closed
    closed Sep 25, 2025
    POSTED
    Sep 10, 2025
    Publication date
    NAICS CODE
    237310
    Primary industry classification
    PSC CODE
    Y1LB
    Product & service classification

    AI Summary

    The Hoffer Lake Access project aims to improve recreational access by paving and widening 1.06 miles of 7th Street NE. The project includes roadway excavation, asphalt concrete pavement, and traffic control measures. The estimated cost ranges from $2,000,000 to $5,000,000, with advertisement scheduled for September 2025 and completion expected by September 2026.

    Contract details

    Solicitation No.
    6982AF25B000017
    Notice Type
    Presolicitation
    Set-Aside
    Total Small Business Set-Aside (FAR 19.5)
    Posted Date
    September 10, 2025
    Response Deadline
    September 25, 2025
    NAICS Code
    237310AI guide
    PSC / Class Code
    Y1LB
    Primary Contact
    Stephanie Navarro
    State
    CO
    ZIP Code
    80228
    AI Product/Service
    service

    Description

    THIS IS NOT AN INVITIATION FOR BID, PLAN AND SPEFICIATIONS ARE NOT AVAILBLE

    PROJECT NUMBER: ND FLAP SDN 7NE(1)

    PROJECT NAME: Hoffer Lake Access

    DESCRIPTION: The purpose and need for the project are to improve the recreational opportunities and enhance the experience for those visiting Hoffer Lake Park. The County Park Board has made improvements to the park over the years which has increased the visitation and usage of the facilities. The project aims to improve access and enhance experience by paving and widening 1.06 miles of 7th Street NE from 5th Avenue NE (CMC 4211) to the main park entrance and through the park terminating at the west end of the park at the unmarked road intersection (assumed 4th Avenue).

    SCOPE OF THE WORK:  The scope of this project is to widen, and pave 7th Street NE from 5th Avenue NE (CMC 4211) through Hoffer Lake Park.  Project will be advertised as Schedule A: From 5th Avenue NE 1.06 mile west through Hoffer Lake Park ending at the north part of the curve where future camping area expansion is planned. Scope includes the following:

    • Reduce the design speed limit from 5th Avenue NE to 25 MPH zone at the park to allow for 0-foot clear zone.
    • Pavement section width to 24-feet (11-foot lanes and 1-foot shoulders).  This is consistent with other roads in the area and driver expectations.
    • With the narrower width adjust grading to fit primarily on the existing road bench to minimize material import and wetland impacts.
    • Remove reconditioning due to the project being 4R with earthwork.

    PRINCIPAL WORK ITEMS:

    • 20401-0000 Roadway Excavation: 6,000 CUYD
    • 20441-0000 Waste: 3,952 CUYD
    • 30101-0000 Aggregate Base: 6,000 TON
    • 40301-0100 Asphalt Concrete Pavement, Type 1: 3,500 TON
    • 63402-0300 Pavement Markings, Type B, Solid: 8.00 MILE
    • 63501-0000 Temporary Traffic Control: LPSM

    ANTICIPATED SCHEDULE: 

    Advertisement – September 2025

    Award – November 2025

    NTP – November 2025

    Contract Completion – September 2026

    ESTIMATED COST RANGE: 

    Total estimated cost between $2,000,000 and $5,000,000

    Key dates

    1. September 10, 2025Posted Date
    2. September 25, 2025Proposals / Responses Due

    AI search tags

    Frequently asked questions

    ND FLAP SDN 7NE(1) HOFFER LAKE ACCESS is a federal acquisition solicitation issued by DEPARTMENT OF TRANSPORTATION. Review the full description, attachments, and submission requirements on SamSearch before the response deadline.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.