Closed Solicitation · DEPARTMENT OF STATE

    NEW WELL DRILLING AND PUMP INSTALLATION

    DEPARTMENT OF STATE
    Sol. 19MR6025Q0013SolicitationWASHINGTON, DC
    Closed
    STATUS
    Closed
    closed Aug 8, 2025
    POSTED
    Jul 9, 2025
    Publication date
    NAICS CODE
    238910
    Primary industry classification
    PSC CODE
    3413
    Product & service classification

    AI Summary

    The U.S. Embassy in Nouakchott, Mauritania, is seeking bids for a Firm Fixed-Price Construction Contract to drill a new well and install a pump, with a deadline for proposals set for August 8, 2025. The project includes engineering studies, drilling to a depth of 70 meters, pump installation, integration with existing systems, construction of a pump house, and water quality testing. Detailed specifications are available in the attached solicitation.

    Contract details

    Solicitation No.
    19MR6025Q0013
    Notice Type
    Solicitation
    Posted Date
    July 9, 2025
    Response Deadline
    August 8, 2025
    NAICS Code
    238910AI guide
    PSC / Class Code
    3413
    Primary Contact
    Katherine Zachara
    State
    DC
    ZIP Code
    20520

    Description

    The U.S. Embassy, Nouakchott Mauritania, intends to issue a Firm Fixed-Price Construction Type Contract in the fourth quarter of Fiscal Year 2025

    The offeror shall provide complete construction services, contract coordination, and supervision, including but not limited to the management and construction necessary to meet the requirements of this contract within the established timeframe.

     The requirement includes the following but is not limited to:

    Engineering Studies and Design: Comprehensive engineering studies will be conducted to determine the optimal location and design for the new well. This includes geological surveys, hydrological assessments, and detailed design plans to ensure the well meets all technical and operational requirements.

    Drilling a New Well: The well will be drilled to a minimum depth of 70 meters with a diameter of 30 centimeters, using unplasticized polyvinyl chloride casing (ASTM F480 and NSF 14, Schedule 40) or as approved by the Contracting Officer's Representative.

    Well Pump Installation: The project includes the purchase and installation of a well pump capable of achieving an optimum pumping rate of 3 to 6 cubic meters per hour.

    Integration with Existing System: The new well will be connected to the existing water distribution pipe, ensuring seamless integration with the current infrastructure.

    Construction of Pump House: A pump house will be constructed to house the well pump and associated equipment, providing protection and facilitating maintenance.

    Automatic Operation with Bypass Feature: The system will be designed to operate automatically, with a bypass feature to ensure continuous water supply in case of any operational issues.

    Water Quality Testing: Comprehensive water quality testing will be conducted to ensure that the well water meets all health and safety standards for potable water. Regular monitoring and testing will be performed throughout the project to ensure compliance with quality standards.

    The complete Scope of Work and specifications are attached in the uploaded solicitation.

    Key dates

    1. July 9, 2025Posted Date
    2. August 8, 2025Proposals / Responses Due

    Frequently asked questions

    NEW WELL DRILLING AND PUMP INSTALLATION is a federal acquisition solicitation issued by DEPARTMENT OF STATE. Review the full description, attachments, and submission requirements on SamSearch before the response deadline.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.