Closed Solicitation · DEPARTMENT OF COMMERCE
AI Summary
The National Institute of Standards and Technology (NIST) is seeking qualified contractors for the replacement of a laboratory fume hood and exhaust system in Building 2, Room 1330 at their Boulder Campus. The project involves comprehensive construction services, including demolition, installation, and various modifications. Interested contractors should respond to this sources sought notice.
The National Institute of Standards and Technology (NIST), Boulder, Colorado, is seeking information from qualified contractors capable of performing construction services for the replacement of an existing laboratory fume hood and associated rooftop exhaust system in Building 2, Room 1330 at the NIST Boulder Campus (325 Broadway, Boulder, CO). The project includes demolition and replacement of an existing tabletop fume hood installed in 1992 with a new walk-in fume hood and hazardous exhaust fan to support new research involving larger equipment and toxic gases. Work will include architectural, mechanical, plumbing, electrical, and fire alarm modifications, including removal and replacement of countertops, sink, plumbing connections, ductwork, rooftop exhaust fan, electrical circuits, cable tray, lightning protection connections, and installation of a panic alarm system integrated with the building fire alarm system. The contractor will also provide structural design and installation of exhaust stack supports, perform ASHRAE 110 performance testing of the hood and exhaust system, and coordinate construction activities with NIST personnel. The anticipated period of performance is approximately six months from the date of award.
NIST BOULDER BUILDING 2 1330 FUME HOOD REPLACEMENT is a federal acquisition solicitation issued by DEPARTMENT OF COMMERCE. Review the full description, attachments, and submission requirements on SamSearch before the response deadline.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.