Closed Solicitation · DEPARTMENT OF TRANSPORTATION

    NM FS 220(1), ROMERO CREEK BRIDGE

    Sol. 6982AF25B000012PresolicitationSet-aside: Total Small Business Set-Aside (FAR 19.5)LAKEWOOD, CO
    Closed
    STATUS
    Closed
    closed Aug 12, 2025
    POSTED
    Jul 28, 2025
    Publication date
    NAICS CODE
    237310
    Primary industry classification
    PSC CODE
    Y1LB
    Product & service classification

    AI Summary

    The Romero Creek Bridge project in Gila National Forest involves replacing a deteriorating bridge structure on Forest Route 220. The project includes significant construction work such as embankment, asphalt pavement, and guardrail installation. It is a total small business set-aside, with an estimated cost between $700,000 and $2,000,000, anticipated to be advertised in Summer 2025.

    Contract details

    Solicitation No.
    6982AF25B000012
    Notice Type
    Presolicitation
    Set-Aside
    Total Small Business Set-Aside (FAR 19.5)
    Posted Date
    July 28, 2025
    Response Deadline
    August 12, 2025
    NAICS Code
    237310AI guide
    PSC / Class Code
    Y1LB
    Primary Contact
    Laura Vallejos
    State
    CO
    ZIP Code
    80228
    AI Product/Service
    both

    Description

    THIS IS NOT A REQUEST FOR BID – PLANS AND SPECIFICATIONS ARE NOT AVAILABLE.

    THIS PROJECT WILL BE ADVERTISED AS A TOTAL SMALL BUSINESS SET-ASIDE.

    PROJECT NUMBER:  NM FS 220(1)

    PROJECT NAME:  Romero Creek Bridge

    PROJECT DESCRIPTION:   This project is located in the Gila National Forest in western-central New Mexico. The terrain is rolling and mountainous with elevations ranging up to 8300 ft.

    The Romero Creek Bridge deck has large areas (approximately 60%) of delamination that are deep (2” to 10”).  The most recent bridge inspection results indicate the structural evaluation of the bridge to be in poor to serious condition.  Proposal would replace this bridge with a similar structure, add bridge rail/guardrail and pave the approaches 100' on each side of the bridge to keep rocks/debris/soil off the deck and to prevent sediment from entering the stream.  NFSR 220 will be a main haul route for an upcoming restoration project within the next few years.  There is potential for thousands of loads of timber to come out on NFSR 220.

    SCOPE OF THE WORK:   This project consists of replacing an existing bridge structure on Forest Route 220 (MP 7.325) over Romero Creek in Catron County, New Mexico.  The existing single-span bridge’s overall length is 30.4-ft and width (out-out) measures 16.0-ft.  The existing roadway width is 14.0-ft.

    PRINCIPAL WORK ITEMS:

    Approximate quantities for major work items:

    • 1 (LPSM) of Removal of Existing Structures and Obstructions
    • 250 CUYD of Embankment Construction    
    • 250 TON of Roadway Aggregate
    • 100 TON of Asphalt Pavement
    • 14-ft x 48-ft of Prefabricated Steel Bridge
    • 50 CUYD of Structural Concrete
    • 200 LNFT of Guardrail, including terminals
    • 100 hours of Equipment Hours          
    • 120 hours of Labor Hours

    It is anticipated this project will be advertised in Summer 2025 and be under construction in the Fall of 2025.  The project has an estimated completion date of Fall 2026.

    Due to weather, no onsite work is to occur from early March to early May.

    ESTIMATED COST RANGE: The anticipated cost range is between $700,000 and $2,000,000.

    Key dates

    1. July 28, 2025Posted Date
    2. August 12, 2025Proposals / Responses Due

    AI search tags

    Frequently asked questions

    NM FS 220(1), ROMERO CREEK BRIDGE is a federal acquisition solicitation issued by DEPARTMENT OF TRANSPORTATION. Review the full description, attachments, and submission requirements on SamSearch before the response deadline.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.