Active Solicitation · DEPT OF DEFENSE

    NOLIN RIVER LAKE TAILWATER RESTROOM CONSTRUCTION

    Sol. W912QR26QA067SolicitationSet-aside: Total Small Business Set-Aside (FAR 19.5)LOUISVILLE, KY
    Open · 6d remaining
    DAYS TO CLOSE
    6
    closes Aug 11, 2026
    POSTED
    Jul 29, 2026
    Publication date
    NAICS CODE
    236220
    Primary industry classification
    PSC CODE
    Y1FB
    Product & service classification

    AI Summary

    The Department of Defense is soliciting bids for the construction of a flush restroom facility at Nolin River Lake, Kentucky. This project requires the contractor to provide all necessary labor, materials, and equipment. The contract is set aside for small businesses under NAICS 236220, with an estimated value between $100,000 and $250,000. Bids are due by 10:00 AM EDT on August 11, 2026.

    Contract details

    Solicitation No.
    W912QR26QA067
    Notice Type
    Solicitation
    Set-Aside
    Total Small Business Set-Aside (FAR 19.5)
    Posted Date
    July 29, 2026
    Response Deadline
    August 11, 2026
    NAICS Code
    236220AI guide
    PSC / Class Code
    Y1FB
    Primary Contact
    Justin McPherson
    State
    KY
    ZIP Code
    40202-2230
    AI Product/Service
    service

    Description

    PROJECT TITLE: NOLIN RIVER LAKE TAILWATER RESTROOM CONSTRUCTION

    PROJECT LOCATION: NOLIN RIVER LAKE, KENTUCKY

    THE CONTRACTOR WILL FURNISH ALL LABOR, MATERIALS, TOOLS AND EQUIPMENT NECESSARY TO CONSTRUCT A FLUSH RESTROOM FACILITY AT THE TAILWATER RECREATION AREA OF NOLIN RIVER LAKE, KENTUCKY IN ACCORDANCE WITH THESE SPECIFICATIONS AND REQUIREMENTS. THE CONTRACTOR'S WORK AND RESPONSIBILITY WILL INCLUDE ALL PLANNING, PROGRAMMING, MEASUREMENTS AND ESTIMATES OF QUANTITIES, ADMINISTRATION, SUPERVISION, COMMUNICATIONS, AND INSPECTION NECESSARY TO ENSURE THAT ALL WORK IS CONDUCTED IN ACCORDANCE WITH THE CONTRACT REQUIREMENTS AND ALL APPLICABLE FEDERAL, STATE, AND LOCAL LAWS AND REGULATIONS. THE PRIME CONTRACTOR SHALL BE RESPONSIBLE FOR ENSURING ALL SUBCONTRACTORS COMPLY WITH THE PROVISIONS OF THIS CONTRACT. PREVAILING CONSTRUCTION WAGE RATES WILL BE REQUIRED AND SHOULD BE CONSIDERED WITH YOUR QUOTE.

    36.204 DISCLOSURE OF THE MAGNITUDE OF CONSTRUCTION PROJECT: BETWEEN $100,000.00 AND $250,000.00.

    THIS PROCUREMENT IS 100% SET-ASIDE FOR SMALL BUSINESS UNDER NAICS 236220, SIZE STANDARD $45,000,000.00.

    IN LIEU OF BOTH PERFORMANCE AND PAYMENT BONDS, PER RFO 52.228-13 ALTERNATE PAYMENT PROTECTIONS (2000) AND RFO 28.102-1(B), ONLY A PAYMENTBOND OR IRREVOCABLE LETTER OF CREDIT IS REQUIRED.

    ***Amendment 0001****

    Updated RFO clause 52.228-13 Alternate Payment Protections, section (a) is updated to allow the contractor to submit a Payment Bond or Irrevocable Letter of Credit as a form of payment protection.

    Offeror due date is updated on PIEE and SAM.gov to 10:00 AM EDT to match box 13(a) and the Special Instructions page of the solicitation. The offeror due date and time remains 10:00 AM EDT on 11 August 2026.

    Box 13(b) is updated to make an offer guarantee not required.

    RFO clauses involving Bid Guarantees are deleted from the solicitation: 52.228-1 Bid Guarantee and 52.228-17 Individual Surety-Pledge of Assets (Bid Guarantee).

    ***Amendment 0001***

    Key dates

    1. July 29, 2026Posted Date
    2. August 11, 2026Proposals / Responses Due

    AI search tags

    Frequently asked questions

    NOLIN RIVER LAKE TAILWATER RESTROOM CONSTRUCTION is a federal acquisition solicitation issued by DEPT OF DEFENSE. Review the full description, attachments, and submission requirements on SamSearch before the response deadline.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.