Active Solicitation · DEPT OF DEFENSE

    North East River Maintenance Dredging, Cecil County, MD

    Sol. W912DR26BA007PresolicitationSet-aside: Total Small Business Set-Aside (FAR 19.5)BALTIMORE, MD
    Open · 7d remaining
    DAYS TO CLOSE
    7
    closes Jun 30, 2026
    POSTED
    Jun 15, 2026
    Publication date
    NAICS CODE
    237990
    Primary industry classification
    PSC CODE
    Z1KF
    Product & service classification

    AI Summary

    The opportunity involves maintenance dredging in the North East River, Maryland, using a hydraulic cutterhead pipeline dredge to remove up to 100,000 cubic yards of material. The project is set for a construction duration of approximately 120 days, with a budget between $1,000,000 and $5,000,000. Dredging is permitted only from October 16, 2026, to February 15, 2027.

    Contract details

    Solicitation No.
    W912DR26BA007
    Notice Type
    Presolicitation
    Set-Aside
    Total Small Business Set-Aside (FAR 19.5)
    Posted Date
    June 15, 2026
    Response Deadline
    June 30, 2026
    NAICS Code
    237990AI guide
    PSC / Class Code
    Z1KF
    Contract Code
    2100
    Issuing Office
    W2SD ENDIST BALTIMORE
    Primary Contact
    Lauren Elamenuel
    State
    MD
    ZIP Code
    21201-2526
    AI Product/Service
    service

    Description

    The project consists of using a hydraulic cutterhead pipeline dredge in North East River to remove material to its authorized depth of 7 feet (plus two feet of allowable over depth). Up to 100,000 cubic yards of silty to sandy material are to be dredged. Material will be transported via pipeline to the existing upland placement site. Pipeline distance will be approximately 6 miles from the furthest dredging location. The pipeline will travel through the North East River, up Stony Run creek, and over tidal and nontidal wetlands to reach the existing upland placement site. The dredging window is from 16 October 2026 to 15 February 2027; this is the only period of time dredging is allowed in the North East River. The estimated magnitude of construction is between $1,000,000.00 and $5,000,000.00. The construction duration will be approximately 120 calendar days from the Notice to Proceed.

    Key dates

    1. June 15, 2026Posted Date
    2. June 30, 2026Proposals / Responses Due

    AI search tags

    Frequently asked questions

    North East River Maintenance Dredging, Cecil County, MD is a federal acquisition solicitation issued by DEPT OF DEFENSE. Review the full description, attachments, and submission requirements on SamSearch before the response deadline.