Closed Solicitation · DEPT OF DEFENSE
AI Summary
The Department of Defense, specifically the Army, is seeking potential contractors for the East St. Louis Design Deficiency BP12 Phase 2 project, with a submission deadline of May 15, 2025. This opportunity involves construction work on the MESD levee system, including the installation of relief wells, reinforced concrete manholes, and various piping systems, as well as dewatering, trenchless pipe installation, and access road construction. Interested businesses must be registered in the SAM Database. For complete details, refer to the attached documentation.
Sources Sought Notice to identify potential System for Award Management (SAM) Database registered businesses that are interested and capable of performing construction work on the MESD levee system which includes 34 t-type (subsurface discharge) relief wells, reinforced concrete manholes and associated lateral and common collector system piping, temporary designed braced steel shoring systems, dewatering of excavations, jack and bore trenchless pipe installation, construction ofaccess roads, close coordination with railroads, fill of low elevation areas, and creation of detention ponds. SEE ATTACHMENT FOR FULL DETAILS
East St. Louis Design Deficiency BP12 Phase 2 is a federal acquisition solicitation issued by DEPT OF DEFENSE. Review the full description, attachments, and submission requirements on SamSearch before the response deadline.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.