Closed Solicitation · DEPT OF DEFENSE

    NOTICE OF INTENT TO SOLE SOURCE MODIFICATION: REDUCED PERIOD OF PERFORMANCE FOR CENTRAL EVERGLADES PLANNING PROJECT (CEPP) CONTRACT 11A, EVERGLADES AGRICULTURAL AREA (EAA) A-2 RESERVOIR FOUNDATION & CUTOFF WALL PROJECT

    Special NoticeJACKSONVILLE, FL
    Closed
    STATUS
    Closed
    closed Oct 24, 2025
    POSTED
    Oct 9, 2025
    Publication date
    NAICS CODE
    237990
    Primary industry classification
    PSC CODE
    Y1KA
    Product & service classification

    AI Summary

    The U.S. Army Corps of Engineers intends to modify Contract W912EP22C0017 on a sole source basis to reduce the period of performance for the Central Everglades Planning Project. The work involves various construction activities related to the foundation preparation for a dam in the Everglades Agricultural Area. Interested parties may submit capability statements by October 24, 2025.

    Contract details

    Notice Type
    Special Notice
    Posted Date
    October 9, 2025
    Response Deadline
    October 24, 2025
    NAICS Code
    237990AI guide
    PSC / Class Code
    Y1KA
    Primary Contact
    Frederick L. Cooper
    State
    FL
    ZIP Code
    32207-8175
    AI Product/Service
    service

    Description

    Intent to Sole Source – Modification: Reduced Period of Performance for Contract W912EP22C0017

    The U.S. Army Corps of Engineers, Jacksonville District intends to modify Contract W912EP22C0017 on a sole source basis to Forgen-Odin JV, 2901 Douglas Blvd STE 300, Roseville, California 95661-4247, under the authority of 10 U.S.C. 3204(a)(1) as implemented by FAR 6.302-1(a)(2)(iii), Only One Responsible Source and no other services will satisfy agency requirements. The purpose of this modification is to reduce the period of performance, from 2029 to 2028 for required project work.

    No reimbursement will be made for any costs associated with providing information in response to this notice. This is not a solicitation for competitive proposals; however, if any interested party believes that they can meet the above requirement, they may submit a capability statement and any relevant documentation to the point of contact(s) listed in this notice. All information furnished must be in writing and must contain sufficient detail to allow SAJ to be able to determine if the interested party can provide the requirement described herein. The submission must be received no later than 24 October 2025.

    Contract Project Description:

    The work includes clearing, grubbing, de-mucking, foundation preparation, installation of a seepage cutoff wall, canal backfilling, blasting, and all incidental related work to prepare approximately 15.3 miles of foundation for a 17.3-mile-long embankment dam, to be constructed under separate contract within the Everglades Agricultural Area (EAA). The approximate toe to toe width of the dam foundation is 260 feet in the north, east, and west; and 235 feet in the south. Surface and subsurface water management are required to conduct work in the dry, in a neat and orderly manner, in accordance with contract specifications.

    Key dates

    1. October 9, 2025Posted Date
    2. October 24, 2025Proposals / Responses Due

    AI search tags

    Frequently asked questions

    NOTICE OF INTENT TO SOLE SOURCE MODIFICATION: REDUCED PERIOD OF PERFORMANCE FOR CENTRAL EVERGLADES PLANNING PROJECT (CEPP) CONTRACT 11A, EVERGLADES AGRICULTURAL AREA (EAA) A-2 RESERVOIR FOUNDATION & CUTOFF WALL PROJECT is a federal acquisition solicitation issued by DEPT OF DEFENSE. Review the full description, attachments, and submission requirements on SamSearch before the response deadline.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.