Active Solicitation · DEPARTMENT OF AGRICULTURE

    NRCS-MA Tyler Dam Rehabilitation Project Floodwater Retarding Dam

    Sol. 12FPC326B0012Combined Synopsis/SolicitationSet-aside: Total Small Business Set-Aside (FAR 19.5)WASHINGTON, DC
    Open · 15d remaining
    DAYS TO CLOSE
    15
    closes Jun 18, 2026
    POSTED
    May 20, 2026
    Publication date
    NAICS CODE
    237990
    Primary industry classification
    PSC CODE
    Y1QA
    Product & service classification

    AI Summary

    The NRCS-MA Tyler Dam Rehabilitation Project involves rehabilitating the existing dam to meet safety standards. Key tasks include excavating the approach channel, installing a geosynthetic clay liner, raising the dam embankment, and replacing concrete joint sealant. A site showing is scheduled for May 27 at 10:00 AM in Marlborough, MA.

    Contract details

    Solicitation No.
    12FPC326B0012
    Notice Type
    Combined Synopsis/Solicitation
    Set-Aside
    Total Small Business Set-Aside (FAR 19.5)
    Posted Date
    May 20, 2026
    Response Deadline
    June 18, 2026
    NAICS Code
    237990AI guide
    PSC / Class Code
    Y1QA
    Contract Code
    12D0
    Issuing Office
    FPAC BUS CNTR-ACQ DIV
    Primary Contact
    Mark Domingo
    State
    DC
    ZIP Code
    20250
    AI Product/Service
    service

    Description

    Please see Attachment 1 Specificaitons document for further details. Tyler Dam Rehabilitation Worchester County, MA Site Showing on: Wednesday, May 27?? at 10:00 AM at the site 200 Robin Hill Street Marlborough, MA 01752 The work consists of rehabilitating the existing dam to be in compliance with current safety and performance standards. Engineering studies identified that the dam has inadequate auxiliary spillway capacity that would result in overtopping and breaching of the embankment during the probable maximum flood. The major items of work include: excavating the approach channel upstream of the auxiliary spillway drop structure by 2.5 feet to improve flow efficiency; installing a geosynthetic clay liner in the auxiliary spillway approach; raising portions of the dam embankment crest to provide additional freeboard and create a uniform crest elevation; constructing a concrete crest wall to provide freeboard and prevent overtopping at a low spot where Robin Hill Street intersects the top of dam; replacing concrete joint sealant above the waterline in the auxiliary spillway and in the principal spillway conduit; replacing existing chain-link fencing surrounding the auxiliary spillway drop structure; and removing trees within 20 feet of the right upstream embankment groin.

    Key dates

    1. May 20, 2026Posted Date
    2. June 18, 2026Proposals / Responses Due

    AI search tags

    Frequently asked questions

    NRCS-MA Tyler Dam Rehabilitation Project Floodwater Retarding Dam is a federal acquisition solicitation issued by DEPARTMENT OF AGRICULTURE. Review the full description, attachments, and submission requirements on SamSearch before the response deadline.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.