Active Solicitation · DEPARTMENT OF TRANSPORTATION

    NV FLAP NYE 10(1) Bob Ruud Mem Hwy & Bell Vista Ave

    Sol. 6982AF26B000003SolicitationSet-aside: No Set aside usedLAKEWOOD, CO
    Open · 20d remaining
    DAYS TO CLOSE
    20
    closes Jun 2, 2026
    POSTED
    May 7, 2026
    Publication date
    NAICS CODE
    237310
    Primary industry classification
    PSC CODE
    Y1LB
    Product & service classification

    AI Summary

    The Central Federal Lands Highway Division is soliciting bids for the reconstruction and rehabilitation of approximately 20 miles of roadway, including safety and drainage improvements on Bob Ruud Memorial Highway and Bell Vista Avenue. The project is anticipated to be advertised in May 2026, with an estimated cost between $20 million and $40 million.

    Contract details

    Solicitation No.
    6982AF26B000003
    Notice Type
    Solicitation
    Set-Aside
    No Set aside used
    Posted Date
    May 7, 2026
    Response Deadline
    June 2, 2026
    NAICS Code
    237310AI guide
    PSC / Class Code
    Y1LB
    Contract Code
    6925
    Primary Contact
    Denise Martinez
    State
    CO
    ZIP Code
    80228
    AI Product/Service
    both

    Description

    PROJECT NUMBER: NV FLAP NYE 10(1) PROJECT NAME: Bob Ruud Mem Hwy & Bell Vista Ave PROJECT DESCRIPTION: The Central Federal Lands Highway Division (CFLHD) intends to issue a solicitation for the reconstruction and rehabilitation of approximately 20 miles of roadway. The project begins in Pahrump at the intersection of State Highway 160 and Bell Vista Avenue and provides access to Ash Meadows National Wildlife Refuge and Death Valley National Park. The project aims to improve safety and drainage on Bob Ruud Memorial Highway and Bell Vista Avenue. Bob Ruud Memorial Highway is characterized as a typical rural highway, while Bell Vista Avenue is in a more urban setting within Pahrump, featuring multiple approach roads. SCOPE OF THE WORK: The project consists of roadway reconstruction, rehabilitation, paving, drainage, and safety improvements. Specific work includes full-depth reclamation (FDR), installation of new aggregate base, asphalt paving, and culvert replacement (with some requiring approximately 10 feet of excavation). PRINCIPAL WORK ITEMS: Major items of work include the following ranges: Aggregate Base: 30,000 - 50,000 tons Full Depth Reclamation (4-inch depth): 22 miles Full Depth Reclamation (8-inch depth): 10 miles Asphalt Pavement: 65,000 - 80,000 tons 24-inch Culvert: 1,000 - 2,500 LNFT ANTICIPATED SCHEDULE: Anticipated advertisement May 2026 with an award June 2026, and a tentative project completion of May 2027. ESTIMATED COST RANGE: Between $20,000,000 and $40,000,000 This is a full and open competition.

    Key dates

    1. May 7, 2026Posted Date
    2. June 2, 2026Proposals / Responses Due

    AI search tags

    Frequently asked questions

    NV FLAP NYE 10(1) Bob Ruud Mem Hwy & Bell Vista Ave is a federal acquisition solicitation issued by DEPARTMENT OF TRANSPORTATION. Review the full description, attachments, and submission requirements on SamSearch before the response deadline.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.