Closed Solicitation · DEPT OF DEFENSE

    P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA

    Sol. N6247324R5227SolicitationSAN DIEGO, CA
    Closed
    STATUS
    Closed
    closed Jun 3, 2025
    POSTED
    May 8, 2025
    Publication date
    NAICS CODE
    237130
    Primary industry classification
    PSC CODE
    Y1NZ
    Product & service classification

    AI Summary

    The Department of Defense is soliciting bids for a Firm-Fixed Price Design-Build contract to construct a 10 MW Battery Energy Storage System (BESS) at the Marine Corps Air Ground Combat Center in Twentynine Palms, California. This project involves two locations, integrating high energy density batteries with solar photovoltaic arrays to enhance grid stability, energy resilience, and cost efficiency. Bidders should note the importance of cyber security accreditation for the BESS controls.

    Contract details

    Solicitation No.
    N6247324R5227
    Notice Type
    Solicitation
    Posted Date
    May 8, 2025
    Response Deadline
    June 3, 2025
    NAICS Code
    237130AI guide
    PSC / Class Code
    Y1NZ
    Primary Contact
    Kathryn Cranford
    State
    CA
    ZIP Code
    92132-5000

    Description

    This acquisition will result in an unrestricted full and open Firm-Fixed Price (FFP) Design-Build contract for the design and construction of a total of 10MW/40MWh (6.0MW/24MWh at cogeneration site 1 and 4.0MW/16MWh at cogeneration site 2) of Battery Energy Storage Systems (BESS) at two (2) locations on MCAGCC, Twentynine Palms, California (P-1238). Each of the
    BESS (each of which will include high energy density batteries, bidirectional inverters, and the associated controls) will be a standalone modular packaged unit connected to one or more solar photovoltaic (PV) arrays. The BESS will be connected to the solar PV systems for clean energy charging as well as to the installation's electric distribution system for utility power or on-site cogeneration system charging. The BESS will be tied into the installation's microgrid (being built via project P-1232) so the battery energy can be discharged to level solar PV variability and stabilize the grid (electrical distribution system reliability), provide power to support black-start and islanding events (energy resilience), and reduce energy costs during peak demand/energy pricing periods (energy management/efficiency). Also, the BESS controls will be accredited to ensure the energy systems remain cyber secure. The goal for this project is to integrate BESS into an electrical distribution microgrid on MCAGCC. The project installs and fully permits new BESS capable of parallel operation, each located in proximity to existing PV systems.

    Key dates

    1. May 8, 2025Posted Date
    2. June 3, 2025Proposals / Responses Due

    Frequently asked questions

    P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA is a federal acquisition solicitation issued by DEPT OF DEFENSE. Review the full description, attachments, and submission requirements on SamSearch before the response deadline.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.