Active Solicitation · DEPT OF DEFENSE
AI Summary
The opportunity involves maintenance dredging at Palm Beach Harbor, including the Entrance Channel and Settling Basins. Bids are due by August 20, 2026, with a target price range of $2 million to $7 million. The project requires environmental and water quality monitoring, and the contractor must commence work within 60 days of receiving the Notice to Proceed.
PROJECT DESCRIPTION: The project work consists of maintenance dredging Palm Beach Harbor within the Entrance Channel, Settling Basin, Extended Settling Basin, and the Expanded Settling Basin. All material must be placed in the Nearshore Placement Area, which is located immediately south of the inlet. Incidental work includes, but is not limited to environmental and water quality monitoring. BIDS DUE: 20 August 2026 at 1:00 PM EDT. NAICS CODE: 237990, OTHER HEAVY CIVIL ENGINEERING CONSTRUCTION. SMALL BUSINESS SIZE STANDARD: $37 million. TARGET PRICE RANGE: Between $2,000,000.00 and $7,000,000.00. PERIOD OF PERFORMANCE: 100 calendar days after receipt of the Notice to Proceed (NTP); the contractor shall commence work within 60 calendar days of receipt of NTP. THIS IS AN UNRESTRICTED PROCUREMENT. **SEE ATTACHED SOLICITATION DOCUMENTATION FOR FURTHER DETAILS AND SUBMISSION INSTRUCTIONS**
PALM BEACH HARBOR MAINTENANCE DREDGING, ENTRANCE CHANNEL AND SETTLING BASINS, PALM BEACH COUNTY, FLORIDA is a federal acquisition solicitation issued by DEPT OF DEFENSE. Review the full description, attachments, and submission requirements on SamSearch before the response deadline.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.