Closed Solicitation · DEPARTMENT OF ENERGY
AI Summary
Fermi National Accelerator Laboratory is seeking proposals for the design, fabrication, assembly, testing, and delivery of a Distribution Valve Box for the PIP-II project. This key subsystem regulates helium flow within the Cryogenic Distribution System of the PIP-II Linac. Proposals are due by November 21, 2025.
Fermi National Accelerator Laboratory (FNAL) is soliciting proposals for the design, fabrication, assembly, testing, and delivery of a Distribution Valve Box (DVB) in support of the Proton Improvement Plan II (PIP-II) project. PIP-II is an upgrade to FNAL’s accelerator complex that will provide the world’s most intense high-energy neutrino beam for the Deep Underground Neutrino Experiment (DUNE). The PIP-II accelerator (Linac) employs superconducting radio frequency technology across multiple cryomodules and relies on a Cryogenic Distribution System (CDS) for helium supply and return. The Distribution Valve Box serves as a key subsystem of the CDS, regulating and controlling helium flow within the PIP-II Linac.
Proposals can be submitted directly to the Primary Contact listed on this Solicitation Notice and within the RFP Document.
October 29, 2025 - Edited SAM.GOV posting to the correct proposal due date from 12/21/25 to 11/21/25 in alignment with the RFP. All RFP Documents remain unchanged.
PIP-II CRYOGENIC DISTRIBUTION SYSTEM - DISTRIBUTION VALVE BOX is a federal acquisition solicitation issued by DEPARTMENT OF ENERGY. Review the full description, attachments, and submission requirements on SamSearch before the response deadline.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.