Active Solicitation · DEPARTMENT OF ENERGY
AI Summary
The Poncha Substation Service project aims to enhance the reliability of the substation service feed and provide backup power to reduce outages. Key tasks include demolition, installation of main service equipment, grounding systems, and removal of existing transformers. This opportunity is a Request for Proposal (RFP) and does not fall under Simplified Acquisition Procedures.
Poncha Substation Service is a multi-part project to increase the reliability of the Poncha substation service feed and provide backup power to help decrease station service outages. The principal components of work include the following: a. Provide demolition and site development. b. Furnish and install main station service equipment consisting of pad mount transformer, safety switches, automatic transfer switch, backup generator, and main AC switchboard. c. Furnish and install over the trench distribution panels inside control building. d. Furnish and install gas cart safety switches. e. Furnish and install LP tank and generator pad. f. Remove and dispose of two (2) existing pad mount transformers designated K1 and K2 with associated equipment. g. Furnish and install grounding systems, conduit, and insulated cable. h. Install associated cable terminations.
Poncha Substation Service is a federal acquisition solicitation issued by DEPARTMENT OF ENERGY. Review the full description, attachments, and submission requirements on SamSearch before the response deadline.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.