Active Solicitation · DEPT OF DEFENSE

    PRE-DEMOLITION SURVEY VARIOUS BUILDINGS NASA WALLOPS FLIGHT FACILITY SURVEY WALLOPS, VA

    Sol. W912DY26RA086SolicitationSet-aside: SBA Certified Economically Disadvantaged WOSB (EDWOSB) Program Set-Aside (FAR 19.15)REDSTONE ARSENAL, AL
    Open · 1d remaining
    DAYS TO CLOSE
    1
    closes Jun 4, 2026
    POSTED
    May 22, 2026
    Publication date
    NAICS CODE
    238910
    Primary industry classification
    PSC CODE
    P400
    Product & service classification

    AI Summary

    This opportunity involves conducting a pre-demolition survey at NASA Wallops Flight Facility to assess environmental contamination, including asbestos and lead-based paint. The contractor will perform environmental sampling, laboratory testing, and provide a comprehensive report detailing findings and recommendations for safe removal and disposal of hazardous materials.

    Contract details

    Solicitation No.
    W912DY26RA086
    Notice Type
    Solicitation
    Set-Aside
    SBA Certified Economically Disadvantaged WOSB (EDWOSB) Program Set-Aside (FAR 19.15)
    Posted Date
    May 22, 2026
    Response Deadline
    June 4, 2026
    NAICS Code
    238910AI guide
    PSC / Class Code
    P400
    Primary Contact
    Tyrone M. Brown,
    State
    AL
    ZIP Code
    35898-0000
    AI Product/Service
    service

    Description

    The objective of this Performance Work Statement is to plan and complete the environmental sampling of facilities at the installation. The structures of concern are listed in Table I. The sampling will determine ACM and ORM materials and complete a Waste Stream Analysis for RCRA 8 metals, lead-based paint (LBP) and PCB’s-in-paint for those parts of the structure currently identified as potentially having any painted components. Following sampling, the Contractor shall be able to completely quantify the environmental contamination present and the methods required to remove and dispose of said contamination in a safe manner. All sampling shall be planned and performed in accordance with Federal, State, and local regulations for the installation. All recommendations for follow-on actions shall also be in accordance with Federal, State, and local regulations. Laboratory testing and analysis shall be completed within the workdays identified in table two following the respective site sampling field activity completion. The results of the site investigation and sampling effort will be provided in an individual Pre-Demolition Assessment Report for the installation that will be submitted within the workdays identified in table two following the receipt of sample results. The intent of this contract effort is to provide comprehensive sampling for all ACM/ORM materials to include the facility exterior, roof, basement/crawl spaces, etc. The Contractor shall make every reasonable effort to access these areas when present in each facility. The Report will specifically address any areas within given structures that were not accessible during the survey and state the size of the area not accessed, and current or immediate previous use of the area not sampled.

    Key dates

    1. May 22, 2026Posted Date
    2. June 4, 2026Proposals / Responses Due

    AI search tags

    Frequently asked questions

    PRE-DEMOLITION SURVEY VARIOUS BUILDINGS NASA WALLOPS FLIGHT FACILITY SURVEY WALLOPS, VA is a federal acquisition solicitation issued by DEPT OF DEFENSE. Review the full description, attachments, and submission requirements on SamSearch before the response deadline.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.