Closed Solicitation · DEPT OF DEFENSE

    PRE-SOLICITATION NOTICE FOR BONNEVILLE SPILLWAY GANTRY CRANE REHABILITATION PROJECT

    Sol. W9127N24R0007PresolicitationPORTLAND, OR
    Closed
    STATUS
    Closed
    POSTED
    Feb 19, 2025
    Publication date
    NAICS CODE
    237990
    Primary industry classification
    PSC CODE
    Y1PZ
    Product & service classification

    AI Summary

    The U.S. Army Corps of Engineers is preparing to solicit a firm fixed-price contract for the rehabilitation of two 350-ton Spillway Cranes at Bonneville Dam in Skamania, Washington, with an estimated value between $10 million and $25 million. The solicitation will be available in March 2025, and the contract is expected to be awarded in December 2025. This opportunity is open to all businesses, with a NAICS code of 237990.

    Contract details

    Solicitation No.
    W9127N24R0007
    Notice Type
    Presolicitation
    Posted Date
    February 19, 2025
    Response Deadline
    NAICS Code
    237990AI guide
    PSC / Class Code
    Y1PZ
    Contract Code
    2100
    Issuing Office
    W071 ENDIST PORTLAND
    Primary Contact
    Dana Western
    State
    OR
    ZIP Code
    97204-3495
    AI Product/Service
    service

    Description

    Pre-solicitation Notice for Bonneville Spillway Gantry Crane Rehabilitation Project

    This is a pre-solicitation notice, not a solicitation for proposals, and NO contract will be awarded from this synopsis.  No reimbursement will be made for any costs associated with providing information in response to this pre-solicitation notice or any follow up postings. 

    The U.S. Army Corps of Engineers (USACE), Portland District has been tasked to solicit and award one firm fixed-price contract for the Bonneville Spillway Crane Rehabilitation Project.

    Project Description:

    The U.S. Army Corps of Engineers, Portland District has a requirement from Bonneville Power Administration to provide the rehabilitation of two 350-ton Spillway Cranes at the Bonneville Dam.  The work is located in Skamania, Washington.

    This will be a firm-fixed-price, design build construction contract. The magnitude of construction is between $10,000,000 and $25,000,000. 100% performance and payment bonds will be required. The government expects to award one contract in December 2025.  The North American Industry Classification System (NAICS) code for this project is 237990 Other Heavy and Civil Engineering Construction and the associated small business size standard is $45 Million. This solicitation is not set aside for small business, i.e. unrestricted and open to both small and large businesses

    The solicitation will follow the Two-Phase Design-Build Selection Procedures as outlined in FAR Subpart 36.3. A site visit will be offered during Phase II of the two-phase selection process. Only one site visit is expected to be offered.

    The solicitation is expected to be made available for download on the sam.gov Contract Opportunities website in March 2025. Offerors are responsible for checking the referenced page for any updates to the Notice. The Government is not responsible for any loss of Internet connectivity or for an offeror's inability to access the documents posted at the referenced website. Proposals will be due approximately 30 days after the solicitation is posted. The exact proposal due date will be indicated in the solicitation.

    System for Award Management (SAM): Offerors must register in the SAM at https://sam.gov/content/home prior to receiving an award.

    Summary Scope of Work

    The scope of this project encompasses the rehabilitation of the two identical spillway gantry cranes, designated as Crane 5 (south) and Crane 6 (north), along with any incidental work related to the project. Each crane is a gantry type with a capacity of 350 tons, featuring four gantry legs, one main hoist trolley, and one auxiliary hoist trolley. The main hoist of each crane is rated for 350 tons. The main hoists are utilized for lifting the spillway gates and splitting the gates, whereas the auxiliary hoists are employed for lifting deck lids and other lighter loads. The rehabilitation work must ensure that the lifting capacities of each crane are preserved.

    Design:

    A 30% conceptual design package which conveys the Government’s design intent will be provided with the Phase II Solicitation. The design package will include schematic plans and specifications.

    Proposed design features include:

    1. Gantry Crane Rehabilitation Electrical Work
    2. Spillway Gantry Crane Mechanical and Structural Rehabilitation
    3. Operator Cabin

    The Contractor will be responsible for continuing this design package to completion. Provide as-built drawings for the new configuration of the existing spillway gantry cranes.

    Construction:

    Proposed construction features are divided into the following primary categories for this project includes:

    1. General:
      1. Replace:
        1. Operator Cab on Gantry Crane 5 and 6, including but not limited to hoist trolley and gantry travel controls inside the operator cab.
        2. Move distribution panels in operator cab to generator platform.
    2. Electrical
      1. Remove
        1. Gantry 5 & 6 decommissioned genset throttle control cable to cab on each
      2. Replace
        1. Runway conductor (bus bar power) and Collector (Bus Collector Shoes) system with cable reel system
        2. Main and auxiliary hoist control and brake system, travel control and brake system, and limit switch control system, bus collector shoes.
        3. Auxiliary hoist trolley power with a cable festoon on gantry 5 similar to the replacement that was done on gantry 6, diesel generators, power distribution panels in operator cab to generator deck, automatic transfer switches, lighting, receptacles, conduit (as needed), and the hoists’ trolley and gantry travel control systems in the operator cab.
    3. Mechanical
      1. Rehabilitate:
        1. Hoist brakes, lower blocks (optional), upper blocks (optional), main hoist drums (optional) and final stage gearing (optional), lifting beams (optional), trolley brakes, and gantry drive motor brakes.
      2. Replace:
        1. Wire ropes for main and auxiliary hoists, auxiliary hoist motor, auxiliary hoist brake, auxiliary hoist speed reducer, trolley motors, gantry drive motors, and generator level roof panels (optional).
      3. Remove:
        1. Gantry 5 decommissioned fuel piping near operator cab.
    4. Structural:
      1. Rehabilitate:
        1. Re-paint and repair handrails as needed.
        2. Connection plates on Gantry 5 and 6
        3. Auxiliary hoist support beams, surface corrosion and section lost on Gantry 5 and 6
        4. Gantry 6, north face of the south leg
        5. Diagonal beam of Gantry 5 channel web
        6. Re-paint lifting beams. (optional)
        7. Touch up painting of the primary structure as needed to prevent further corrosion or concern for structural integrity. (optional)
      2. Replace:
        1. Contractor to design access to auxiliary hoist maintenance platforms on both Gantry cranes
        2. Damaged bracing over 3 feet of length of the Gantry 6 NW corner diagonal strut.

    Estimated duration for the contract will be approximately 26 months and is anticipated to start December 2025.

    Proposals will be evaluated under the Two-Phase Design Build Process, using the best-value trade-off process.

    The solicitation (request for proposal) posting will follow this synopsis and is anticipated to be posted on or about 6 March 2025.

    Key dates

    1. February 19, 2025Posted Date

    AI search tags

    Frequently asked questions

    PRE-SOLICITATION NOTICE FOR BONNEVILLE SPILLWAY GANTRY CRANE REHABILITATION PROJECT is a federal acquisition solicitation issued by DEPT OF DEFENSE. Review the full description, attachments, and submission requirements on SamSearch before the response deadline.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.