Active Solicitation · DEPT OF DEFENSE

    PUMP UNIT,CENTRIFUG

    Sol. N0010426QJB31SolicitationMECHANICSBURG, PA
    Open · 7d remaining
    DAYS TO CLOSE
    7
    closes Apr 30, 2026
    POSTED
    Apr 22, 2026
    Publication date
    NAICS CODE
    333914
    Primary industry classification
    PSC CODE
    4320
    Product & service classification

    AI Summary

    The Department of Defense is soliciting quotes for the repair of a centrifugal pump unit, with a required repair turnaround time of 110 days. Contractors must provide pricing and capacity constraints if unable to meet the RTAT. Government inspection is required, and the contract may include an option quantity. Quotes should be submitted to the provided contact email.

    Contract details

    Solicitation No.
    N0010426QJB31
    Notice Type
    Solicitation
    Posted Date
    April 22, 2026
    Response Deadline
    April 30, 2026
    NAICS Code
    333914AI guide
    PSC / Class Code
    4320
    State
    PA
    ZIP Code
    17050-0788
    AI Product/Service
    service

    Description

    ** CASREP ** ACCELERATED DELIVERY IS ENCOURAGED AND ACCEPTED AT NO ADDITIONAL
    COST TO GOVERNMENT.
    All freight is FOB Origin.
    This RFQ is for repair. The resultant award of this solicitation will be
    issued bilaterally, requiring the contractor’s signed acceptance prior to
    execution. Verify nomenclature, part number, and NSN prior to responding.
    The Government is seeking a Repair Turnaround Time (RTAT) of: 110 days
    Government Source Inspection (GSI) is required.
    Please note freight is handled by the Navy as per the Commercial Asset
    Visibility (CAV) Statement of Work.
    Your quote should include the following information:
    ***************QUOTE AMOUNT AND RTAT ***************
    * Unit Price:__________
    * Total Price:__________
    * Repair Turnaround Time (RTAT): _______ days
    If your company is not quoting the Government’s Required Repair Turnaround
    Time (RTAT) or earlier, provide your company’s capacity constraints?
    _________________________________________________________________
    _________________________________________________________________
    _________________________________________________________________
    Repair Turnaround Time (RTAT): the resultant contractual delivery requirement

    is measured from asset Return to the date of asset acceptance under the terms
    of the contract. For purposes of this section, Return is defined as physical
    receipt of the F-condition asset at the contractor’s facility as reflected in
    the Action Date entry in the Commercial Asset Visibility (CAV) system. In
    accordance with the CAV Statement of Work, the contractor is required to
    accurately report all transactions by the end of the fifth regular business
    day after receipt and the Action Date entered in CAV must be dated to reflect
    the actual date of physical receipt. The Contractor must obtain final
    inspection and acceptance by the Government for all assets within the RTATs
    established in this contract.
    * Check one: Firm-fixed-Price ___ Estimated ___ Not-to Exceed (NTE): ___
    * Return Material Authorization # (RMA), if applicable:__________
    * Delivery Vehicle (if Delivery Order requested) (if your company has a
    current BOA/IDIQ, for example) :__________________
    *** IF ITEM NOT PREVIOUSLY PURCHASED BY NAVSUP WSS - or - PRICES INCREASED ***
    * Provide the NSN of a similar item or, if current NSN is an upgrade part,
    provide the previous NSN.
    * If previously sold to another buying activity or in the commercial
    marketplace, provide a copy of your company’s invoice (redacted versions are
    acceptable).
    * If pricing is not in line with historical pricing, provide the basis of your
    company’s pricing.
    ***************TESTING AND EVALUATION IF BEYOND REPAIR***************
    * T&E fee/price (if asset is determined BR/BER): If an item is determined BR,
    and the contractor provides documentation that costs were incurred during
    evaluation and determination of BR, the contracting officer will negotiate a
    reduced contract price, not-to exceed (NTE) $___________associated with the
    repair effort to reflect the BR status of the equipment.
    * The T&E fee (if asset is determined BR/BER) was determined/computed based
    on:______________________________________.
    ***************AWARDEE INFO & PERFORMANCE LOCATION***************
    * Awardee CAGE: __________
    * Inspection & Acceptance CAGE, if not same as ""awardee CAGE"": __________
    * Facility/Subcontractor CAGE (where the asset should be shipped), if not same
    as ""awardee CAGE"":__________
    *************** IOT COMPARE REPAIR PRICE TO PRICE TO BUY NEW***************
    * New unit price:__________
    * New unit delivery lead-time:__________
    The Government intends to add an option quantity to the resultant contract.
    In reference to the option quantity, the Government may increase the quantity
    of supplies called for in the Schedule at the unit price specified. The
    Contracting Officer may exercise the option by written notice to the
    Contractor within the number of days in FAR 52.217-6 herein. Delivery of the

    added items shall continue at the same rate as the like items called for under
    the contract, unless the parties otherwise agree.
    IMPORTANT NOTE: Any asset for which the contractor does not meet the required
    RTAT will incur a price reduction per unit/per month the contractor is late -
    any delay determined to be excusable (e.g. Government Delay) will not result
    in a price reduction. If a price reduction is required due to inexcusable
    contractor delay, the Contracting Officer will implement the aforementioned
    price reduction via a ""reconciliation modification"" at the end of the
    contract performance. Price reductions made pursuant to this section shall
    not limit other remedies available to the Government for failure to meet
    required RTATs, including but not limited to the Government’s right to
    terminate for default.
    In reference to the above important note, the contractor provides the
    following price reduction amount per unit per month the contractor does not
    meet the RTAT: $__________, up to a maximum of: $_________.
    INSPECTION AT ORIGIN
    ACCEPTANCE AT ORIGIN
    POC EMAIL: ALEXANDER.S.CRAFT.CIV@US.NAVY.MIL

    Key dates

    1. April 22, 2026Posted Date
    2. April 30, 2026Proposals / Responses Due

    AI search tags

    Frequently asked questions

    PUMP UNIT,CENTRIFUG is a federal acquisition solicitation issued by DEPT OF DEFENSE. Review the full description, attachments, and submission requirements on SamSearch before the response deadline.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.