Closed Solicitation · DEPT OF DEFENSE

    PYROTECH ULTRA HIGH SPEED DELUGE SYSTEM

    Sol. W911S225U1525Combined Synopsis/SolicitationSet-aside: Total Small Business Set-Aside (FAR 19.5)FORT DRUM, NY
    Closed
    STATUS
    Closed
    closed Aug 19, 2025
    POSTED
    Aug 11, 2025
    Publication date
    NAICS CODE
    333998
    Primary industry classification
    PSC CODE
    4240
    Product & service classification

    AI Summary

    The Department of Defense, specifically the Army, is seeking bids for a Pyrotech Ultra High Speed Deluge System, with a revised NAICS code of 333998. The contract includes various components such as solenoids, nozzles, and detectors, along with a customized control panel and on-site commissioning services. Bidders should note the requirement for a two-year warranty on Pyrotech equipment and a five-year warranty on detector equipment. The deadline for submissions is August 19, 2025.

    Contract details

    Solicitation No.
    W911S225U1525
    Notice Type
    Combined Synopsis/Solicitation
    Set-Aside
    Total Small Business Set-Aside (FAR 19.5)
    Posted Date
    August 11, 2025
    Response Deadline
    August 19, 2025
    NAICS Code
    333998AI guide
    PSC / Class Code
    4240
    Issuing Office
    W6QM MICC-FT DRUM
    Primary Contact
    MIKE FABRY
    State
    NY
    ZIP Code
    13602-5220

    Description

    Implemented Amendment to change NAICS from 922160 to 33998 and to change PSC code from F003 to 4240Pyrotech Deluge Package Ultra high speed deluge system? RAM Qty 1 LAM Qty 3 RAM BP Qty 1 LAM BP Qty 3 Brass Solenoid Qty 12 CPF-74B Qty 12 Nozzles Qty 12 Or-check Qty 12 19 inch Rack Qty 1 Control Enclosure Qty 1 LaMarche Charger Qty 1 Battery Enclosure Qty 1 D171-AM Detector Qty 12 D171 Detector Mount Qty 12 Includes Pyrotech UHSD system components with the addition of a pre-wired control panel and power system engineered by Pyrotech plus an on-site visit by a Pyrotech technician. Visit includes commissioning (start-up, testing and training) and up to 3 days on site. Customized Ultra-High Speed Deluge Control Panel design and fabrication Ultra-High Speed Deluge Control Panel: Three part enclosure with viewing door? System Ready indication (green light) System Fault indication (amber light) System lamp test AC Loss indication (amber light) Supervised electrical manual discharge capability Adjustable auto reset (Automatic reset was initially developed to meet EPA requirements regarding contaminated water. The integral feature allows water to flow for a predetermined time from 0 to 90 seconds and automatically shut off. If, at any time in the predetermined time cycle, an alarm occurs, the RAM and any corresponding LAMs will actuate solenoids to provide deluge coverage. This feature can be field adjusted or bypassed) Supervision of the solenoid wiring for short, open and ground (amber LED for each fault) Supervision of the detector wiring for short, open and ground General form C alarm and fault contacts (i.e. external devices, machine shutdown, etc.) Relays with integral suppression and status LEDs for easier troubleshooting Individually fused zones? Custom Graphic Annunciator indicating zone alarm (on multiple zone panels). Required RAMs (Response Acceleration Modules) The RAM supervises solenoid and electrical manual pull circuitry (if electrical manual pulls are used) for short, open and ground faults. The RAM provides the required high speed, high voltage pulse to achieve the required system reaction speed. The RAM has a key switch to individually inhibit each zone if desired. The RAM has the required internal circuitry to provide automatic reset. The RAM has an integral test jack for system reaction time tests. Required LAMs (Low cost Acceleration Module) The LAM is a slave module to the RAM. The LAM supervises solenoid circuitry for short, open and ground faults. It controls up to four solenoids. The LAM provides the required high speed, high voltage pulse to achieve the required system reaction speed. (This module not required for this application.) Solenoids CPF-74B3 High Speed Deluge Valves Nozzles (38MA) Unitized UV/IR detectors and mounting brackets Battery charger Battery backup (sealed, lead-acid with gelled electrolyte, 8 hours backup / 16 hour recharge) Battery enclosure CAD generated drawings (electronic file) Mechanical manual discharge capability (control panel power is not required to activate this feature) Electrical control panel design Mechanical design assistance 1 set of system manuals (electronic file) Instrumentation and personnel necessary for startup, test and training (includes expenses and up to 3 days on site for each system) Delivery to your facility Pyrotech components are Made In USA 2 year warranty on all Pyrotech equipment 5 year warranty on Detector equipment

    Key dates

    1. August 11, 2025Posted Date
    2. August 19, 2025Proposals / Responses Due

    Frequently asked questions

    PYROTECH ULTRA HIGH SPEED DELUGE SYSTEM is a federal acquisition solicitation issued by DEPT OF DEFENSE. Review the full description, attachments, and submission requirements on SamSearch before the response deadline.