Closed Solicitation · DEPARTMENT OF AGRICULTURE

    RENOVATE MARSHALL GULCH PICNIC AREA & TRAILHEAD

    Sol. 127EAX25R0015SolicitationSet-aside: 8(a) Set-Aside (FAR 19.8)Albuquerque, NM
    Closed
    STATUS
    Closed
    closed Sep 22, 2025
    POSTED
    Sep 12, 2025
    Publication date
    NAICS CODE
    237310
    Primary industry classification
    PSC CODE
    Z1LB
    Product & service classification

    AI Summary

    The opportunity involves renovating the Marshall Gulch Picnic Area and Trailhead, including constructing a new asphalt road, installing bridges, and improving picnic areas. A site visit is scheduled for August 28, 2025, and the proposal due date has been extended to September 22, 2025. Interested bidders should review the updated Q&A and attachments for further details.

    Contract details

    Solicitation No.
    127EAX25R0015
    Notice Type
    Solicitation
    Set-Aside
    8(a) Set-Aside (FAR 19.8)
    Posted Date
    September 12, 2025
    Response Deadline
    September 22, 2025
    NAICS Code
    237310AI guide
    PSC / Class Code
    Z1LB
    Sub-Agency
    FOREST SERVICE
    Primary Contact
    Troy A. McCullough
    State
    NM
    ZIP Code
    871023498
    AI Product/Service
    both

    Description

    Amendment 1 - This amendment updates Q&A's, incorporates updated SOI and extends the Proposal Due date to September 22nd, 2025, 1300 CD.

    Q&A's and attachments have been published.

    Site Visit has been scheduled for August 28th, 2025 @10:00 am Local Time.  Location will be Marshall Gulch Picnic Area, Mt. Lemmon, AZ 85619.  Coordinates - 32.4283560, -110.7556069.  The proposal due date will be extended from September 1st, 2025 to September 15th, 2025.

    Work primarily consists of the construction of a 1,100-foot-long single-lane asphalt road with 32 roadside parking spaces and installation of two precast and prestressed beam bridges. The bridge designs are 64 and 76 feet long, both 30 feet wide with clear heights of approximately 8 feet. Additional items include relocating a CXT vault restroom, constructing new and demolishing old picnic areas, installing new and removing old culverts, removing retaining walls, reconstructing a small channel, and various small  improvements associated with the picnic areas and trailhead.

    Key dates

    1. September 12, 2025Posted Date
    2. September 22, 2025Proposals / Responses Due

    AI search tags

    Frequently asked questions

    RENOVATE MARSHALL GULCH PICNIC AREA & TRAILHEAD is a federal acquisition solicitation issued by DEPARTMENT OF AGRICULTURE. Review the full description, attachments, and submission requirements on SamSearch before the response deadline.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.