Closed Solicitation · DEPT OF DEFENSE

    REPAIR INTERIOR CEILING, B224

    Sol. FA527025R0009SolicitationAPO, AP
    Closed
    STATUS
    Closed
    closed Jun 30, 2025
    POSTED
    May 30, 2025
    Publication date
    NAICS CODE
    236220
    Primary industry classification
    PSC CODE
    Z2AZ
    Product & service classification

    AI Summary

    The Department of Defense, specifically the Air Force, is soliciting bids for a design-build project to repair the interior ceiling of Building 224. This includes full abatement of asbestos-containing materials, repair of spalls and cracks, and temporary removal of existing systems. Contractors must adhere to federal and local regulations, integrating sustainable practices. Work can begin after approval of the Environmental Protection Plan and necessary clearances. Detailed requirements are provided in the project documents.

    Contract details

    Solicitation No.
    FA527025R0009
    Notice Type
    Solicitation
    Posted Date
    May 30, 2025
    Response Deadline
    June 30, 2025
    NAICS Code
    236220AI guide
    PSC / Class Code
    Z2AZ
    Issuing Office
    FA5270 18 CONS PK
    Primary Contact
    Victor Cannon
    City
    APO
    ZIP Code
    96368-5199
    AI Product/Service
    service

    Description

    PROJECT REQUIRMENTA) This project shall accomplish a design-build repair the true ceiling of B224. Work includes full Asbestos-Containing Material (ACM) abatement of the ceiling paint and repair spalls and cracks. Include any site preparation work such as temporary removal of the suspended ceiling, lighting system, alarm, electrical wiring and conduit, and ceiling hung air-condition unit. Sustainable principles, to include life cycle cost-effective practices, will be integrated into the design, development, and construction of the project in accordance with UFC 1-200-02, High Performance and Sustainable Building Requirements.B) The scope of work may require the sampling, removal/abatement, and disposal of ACM, LBP, or other hazardous building materials.C) The Contractor shall determine the best technical design solution in conformance with current regulations. The design and construction work shall comply with US federal, Department of Defense, Air Force, and 18 Wing criteria, as well as applicable Japan regulatory requirements not specifically stated elsewhere in this project statement of work to provide a complete and usable facility upon completion.D) The detailed Scope of Work is described here-in below and the attached supporting documents.E) Construction activities may commence after the approval of the Environmental Protection Plan (EPP) and AF Form 130 (Work Clearance). The Contractor shall coordinate on-site safety requirements through 718th Civil Engineer Squadron (718 CES)

    Key dates

    1. May 30, 2025Posted Date
    2. June 30, 2025Proposals / Responses Due

    AI search tags

    Frequently asked questions

    REPAIR INTERIOR CEILING, B224 is a federal acquisition solicitation issued by DEPT OF DEFENSE. Review the full description, attachments, and submission requirements on SamSearch before the response deadline.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.