Closed Solicitation · DEPARTMENT OF HOMELAND SECURITY

    REPLACE FIRE HYDRANT AT USCG AIR STATION CLEARWATER

    Sol. 20150PR260000047Combined Synopsis/SolicitationSet-aside: Total Small Business Set-Aside (FAR 19.5)MIAMI, FL
    Closed
    STATUS
    Closed
    closed Mar 13, 2026
    POSTED
    Feb 18, 2026
    Publication date
    NAICS CODE
    238290
    Primary industry classification
    PSC CODE
    Y1EZ
    Product & service classification

    AI Summary

    The U.S. Coast Guard is seeking proposals for the replacement of a fire hydrant at Air Station Clearwater. This opportunity is a combined synopsis/solicitation for construction services, with a firm-fixed-price contract to be awarded based on the lowest price technically acceptable. Interested bidders must inspect the site and submit their proposals by March 13, 2026.

    Contract details

    Solicitation No.
    20150PR260000047
    Notice Type
    Combined Synopsis/Solicitation
    Set-Aside
    Total Small Business Set-Aside (FAR 19.5)
    Posted Date
    February 18, 2026
    Response Deadline
    March 13, 2026
    NAICS Code
    238290AI guide
    PSC / Class Code
    Y1EZ
    Issuing Office
    BASE MIAMI(00028)
    Sub-Agency
    US COAST GUARD
    Primary Contact
    CWO Jose Calderon
    City
    MIAMI
    State
    FL
    ZIP Code
    33132
    AI Product/Service
    service

    Description

    COMBINED SYNOPSIS/SOLICITATION CONSTRUCTION

    Replace Fire Hydrant at USCG Air Station Clearwater

    1. General Information

    Solicitation Number: 20150PR260000047

    Date Posted: 02/18/2026

    Response Due Date: Friday March 13, 2026, at 2:00PM EST

    NAICS Code: 238290      Other Building Equipment Contractors

    Set-Aside: Total Small Business Set a Side

    Contracting Office: USCG PROCUREMENT & CONTRACTINNG

    12100 SW 152ND ST

    MIAMI, FL 33177

    Point of Contact:  Mehdi Bouayad

    Email: Mehdi.Bouayad@uscg.mil

    571-607-8108

    2. Description of Work

    This is a combined synopsis/solicitation for construction services prepared in accordance with FAR Part 36 and FAR Part 13. The U.S. Government intends to award a firm-fixed-price contract based on the lowest price technically acceptable (LPTA) or best value tradeoff method.

    Scope of Work:

    General:

    United States Coast Guard Air Station Clearwater is accepting proposals for qualified individuals

    or firms to replace one fire hydrant at Air Station Clearwater. Prior to submitting a quote, it is

    mandatory to examine the scope of work and it’s highly recommended to visit the facility to take

    field measurements, evaluations, etc. and become familiar with existing conditions under which

    The work will be performed. After the award of contract, a pre-conference will be held prior to

    starting work at Coast Guard Air Station Clearwater.

    Location:

    U.S. Coast Guard Air Station Clearwater

    15100 Rescue Way

    Clearwater, Florida 33762

    Examination of Site: It is HIGHLY ENCOURAGED that bidders carefully inspect the

    workplace and verify all work necessary to complete job. Prospective bidders arrange for a tour

    of the job site by calling the point of contact, CWO Joe Calderon at 727-423-7586 or via email at Jose.A.Calderon@uscg.mil or  DC1 Richard Rendon at (727) 535-1437 x1550 or

    by email at Richard.L.Rendon@uscg.mil, at least 3 working days in advance.

    1. Continuity of Facilities Operation:

    Schedule work to minimize interference with the facility operations and during the normal

    operating hours of 7:00 am to 3:00 pm Monday thru Friday, excluding federal holidays. Work

    may be conducted during other hours if approved in advance by coordinating with the facility

    Point of Contacts (POC) listed below.

    2. Notification of Start and Completion of Work:

    The Contractor shall provide a simple and general schedule of work. For example, “Begin work

    at ____ on _______. Work is expected to last __ days and be complete on _______.”

    3. Coast Guard Points of Contact:

    The Contractor shall coordinate with the following personnel to arrange access the facility.

    POC’s are listed in order of preference.

    Name Email / notes Phone Number

    CWO Joe Calderon Jose.A.Calderon@uscg.mil 727-423-7586 (cell phone)

    MKC Mike Hemmingway Jonathan.M.Hemmingway@uscg.mil

    727-535-1437 x1573

    DC1 Rich Rendon Richard.L.Rendon@uscg.mil 727-535-1437 x1550

    Page 3 of 13

    4. Recycling and Disposal of Refuse:

    Minor refuse and waste materials resulting from operations may be disposed of in Air Station

    Clearwater dumpsters. All disposals shall be done in accordance with federal, state, and local

    laws and regulations. No Hazardous Waste or bulk waste may be disposed of in Air Station

    Clearwater dumpsters.

    5. Safety:

    During the execution of this contract, the Contractor shall conform to the rules and regulations as

    set forth by OSHA State and Federal regulations. Immediate notification to the Contracting

    Officer’s Representative of lost time due to accidents is required. Provide two copies of

    Workman’s compensation accident reports by noon of the day following the accident. The Coast

    Guard reserves the right to bar any workers or supervisors from the premises should they be

    documented as violating set safety standards and regulations.

    6. Inspection:

    The Contracting Officer’s Representative has the right to reject defective workmanship or

    materials or work not performed as per the contract specifications.

    7. Operations and Storage:

    The Coast Guard has no responsibility for receipt, storage, or protection of contractor’s

    materials. The Coast Guard will not accept shipments, and no materials may be stored on site

    by the contractor. The contractor is responsible for the protection of existing structures and utilities

    and vegetation. Any damage shall be repaired at the contractor’s expense.

    8. Utilities:

    Contractor is authorized to use Air Station Clearwater power and water while conducting the

    work efforts outlined in this document. Any other use of power is not authorized. The unit POC’s

    listed above will designate available utility connection points if necessary.

    9. General Regulations while onboard Coast Guard Air Station Clearwater:

    1. Daily colors and the raising/lowering of the American flag will take place every morning

    at 0800 and every evening at sunset. All personnel on Base will face the main flagpole &

    maintain silence and all vehicles & equipment will halt during these brief events.

    2. Contractors are welcome to eat breakfast & lunch at Base in the base galley at published

    meal rates. Breakfast is served from 0600-0730 daily & lunch will be served from 1100-

    1230 daily in the galley. All personnel desiring meal service shall be in clean, non-soiled

    clothing. The Coast guard reserves the right to refuse service to anyone it deems dirty.

    3. Contractors are welcome to utilize the Base’s Exchange store; however, contracted

    personnel are prohibited from purchasing any uniform, alcohol or tobacco products in it.

    4. Traffic Regulations:

    a. 10 mph speed limit

    b. No use of cell phones is permitted while driving vehicles or operating heavy

    machinery.

    Page 4 of 13

    c. All personnel shall obey all marked traffic signals including stop signs &

    stoplights.

    5. Notice shall be given to the Coast Guard’s representative 1 week in advance of any

    planned outages, including any pool closure and expected duration.

    6. Contractors are welcome to utilize the restrooms in the area they are currently working in

    providing they are clean and do not track mud, dirt or any other debris into the

    restrooms.

    7. No personnel other than the Contracting Officer has the authority to alter the terms of any

    contract or to issue any change orders. Accordingly, the contractor shall not complete

    any work that would incur additional costs to the government without written approval

    from the Contracting Officer.

    10. SECURITY REQUIREMENTS:

    1. The contractor shall provide a consolidated list of all contractor personnel who will be

    working on Air Station Clearwater Facilities at least 1 week prior to work. This is for

    routine/ standard background checks of all personnel entering the base. Information

    required is full name, date of birth, and last 4 digits only of Social Security Number.

    2. Only American citizens and permanent resident aliens are allowed onboard Air Station

    Clearwater Facilities. Absolutely no foreign nationals are permitted on the premises.

    Appropriate identification shall be provided at the front gate to attain base entry.

    3. All contractor vehicles, equipment and gear onboard Coast Guard properties are subject

    to search, at all times. Additionally, at all times due to security and operational needs, the

    contractor is subject to orders to evacuate the property at any time.

    4. Absolutely no firearms or weapons of any kind are allowed onboard Air Station

    Clearwater.

    5. The contractor and subcontractor personnel shall wear company identification and

    always carry photo identification on their person. Personnel shall not stray from the

    immediate area of work nor direct avenues of ingress and egress unless authorized in

    advance.

    11. SCOPE OF WORK:

    Contractor shall provide all labor, trades, equipment, components, materials, tools, and

    supervision necessary to replace non-functioning fire hydrant and installation of a new American

    Darling 5-1/4” Fire Hydrant. All work shall be completed in accordance with industry and

    manufacturing standards.

    Objectives:

     Replace the existing non-functional fire hydrant with new American Darling

    Model 5-1/4” Fire Hydrant.

     Ensure compatibility with the base’s water supply and fire protection

    requirements.

     Restore the site to original condition.

    Page 5 of 13

    Contractor Responsibilities:

     Contractors shall provide all labor, materials, equipment, permits, supervision and

    quality control.

     *Note* USCG is furnishing Fire Hydrant, Traffic flange, Gate valve, and

    associated gaskets. (See pictures below)

     The contractor shall be responsible for repairing, at no cost to the government,

    any damage caused during the installation of the fire hydrant.

    Work Requirements:

    Pre-Construction

     Conduct site visit and utility verification.

     Coordinate with USCG Facility Engineering for access and safety requirements.

     Perform utility locates.

     Submit product data for approval.

     Identify potential interferences and job hazards

    Demolition and Removal

     Identify Main Water Supply control and isolation valves (see pictures below)

     Isolate and depressurize the water main.

     Excavate around the hydrant assembly.

     Remove hydrant and associated parts.

     Dispose of materials as per regulations.

    Hydrant Installation

     Install a new American Darling fire hydrant, including Traffic flange, 5-1/4” and

    any associated parted needs.

     Gravel bed if required.

     Proper burial depth.

     Hydrant orientation per local and city codes.

    Testing and Operation

     Flush service line

     Pressure test per AWWA C600.

     Flow test of hydrant to verify leak free operation, proper drainage, adequate flow

    and residual pressure.

     Demonstrate operation to USCG Facilities.

    Site Restoration

     Backfill excavation

     Restore pavement, concrete, and landscaping disturbed during work to original

    condition or better.

     Apply corrosion protection to exposed metal hardware as required.

     Paint hydrant red.

    Deliverables

     Pressure and flow test results

     Drawings (If applicable)

    Page 6 of 13

    Contractor shall be responsible for the removal of all trash and debris from project area off site

    upon completion.

    All work must be approved by the Contracting Officer’s Representative.

    Warranty:

    The Contractor warrants that all workmanship shall be free from defects for a period of one years

    from the date of substantial completion.

    12. ACCEPTANCE OF WORK:

    When the contractor has completed all work, they shall notify the Coast Guard (COR) for a final

    inspection with least a 24-hour notice. If there are any project discrepancies noted, they shall be

    corrected within 5 business days of discovery. The work will be accepted as complete upon

    verified correction of any/ all noted discrepancies. After work acceptance, the contractor shall

    submit final invoice to the Coast Guard as directed by the COR.

    Place of Performance:

    USCG Air Station Clearwater

    15100 Rescue Way

    Clearwater, FL 33762

    Magnitude of Construction:

    Not to exceed $13K

    3. Submission Details

    Proposals Due By: Friday Mar 13, 2026/2pm EST

    Submission Method: [Email Mehdi.Bouayad@uscg.mil or Mailed Bids]

    Technical Proposal (demonstrating capability and experience).

    Price Proposal (detailed cost breakdown).

    Past Performance References will be reviewed

    4. Site Visit Highly Recommended but not mandatory **************** Wednesday Feb 25, 2026 at 10:00AM EST*****************

    Site Visit Coordinator is CWO Joe Calderon           Email: Jose.A.Calderon@uscg.mil            Phone: 727-423-7586

    5. Evaluation Criteria

    Award will be made based on [Lowest Price Technically Acceptable (LPTA) / Best Value] criteria. Proposals will be evaluated on:

    1. Technical Acceptability – Demonstrated experience in similar projects.

    2. Past Performance – Positive references from previous construction work.

    3. Price Reasonableness – Competitive pricing aligned with market rates.

    6. Contract Terms and Conditions

    This procurement is subject to the following:

    Davis-Bacon Act Compliance: Wage Rates FL20260222 Revised on 01/02/2026

    FAR Clauses 52.236-2 (Differing Site Conditions), 52.236-3 (Site Investigation), 52.236-5 (Material and Workmanship), 52.236-7 (Permits and Responsibilities).

    Other federal, state, and local regulations governing construction contracts.

    7. Inquiries

    All questions regarding this solicitation must be submitted in writing to CWO Joe Calderon no later than Tuesday Mar 10, 2026.

    Issued By:

    Contracting Officer Mr. Mehdi Bouayad

    United States Coast Guard

    8. Additional Clauses and Provisions

    8.1 Safety and Health Requirements

    The contractor shall comply with:

    • Occupational Safety and Health Administration (OSHA) Standards (29 CFR 1926) for construction safety.
    • U.S. Army Corps of Engineers Safety Manual EM 385-1-1, if applicable.
    • Submission of a Site-Specific Safety Plan (SSSP) within [X] days after award.
    • Implementation of Personal Protective Equipment (PPE) and safety measures for workers on-site.

    8.2 Environmental and Sustainability Requirements

    • The contractor shall comply with National Environmental Policy Act (NEPA) and all EPA regulations.
    • Use of environmentally preferable products and materials in accordance with FAR 23.1 (Sustainable Acquisition Policy).
    • Proper disposal and handling of hazardous materials per Resource Conservation and Recovery Act (RCRA).
    • Stormwater Pollution Prevention Plan (SWPPP) implementation (if applicable).

    8.3 Compliance with the Davis-Bacon Act

    For contracts over $2,000, the contractor shall comply with the Davis-Bacon Act (40 U.S.C. 3141–3148):

    • Submit certified payroll reports weekly.
    • Pay laborers and mechanics at least the prevailing wage rates specified in the wage determination.

    8.4 Delays and Liquidated Damages

    • If the contractor fails to complete work by the agreed deadline, the Government may impose liquidated damages of $[X] per calendar day of delay.
    • Delays due to unforeseen conditions (e.g., weather, force majeure) must be reported within 24 hours and documented.

    8.5 Subcontracting Limitations

    • In accordance with FAR 52.219-14, at least 15% of the contract value must be performed by the prime contractor (for general construction).
    • Subcontractors must be pre-approved, and the prime contractor remains liable for their compliance.

    8.6 Material and Workmanship Standards

    • All materials shall conform to industry standards (ASTM, ANSI, etc.) and be subject to Government inspection.
    • The Government reserves the right to reject defective work and require rework at contractor’s expense.

    8.7 Bonding and Insurance Requirements

    • For contracts over $150,000, performance and payment bonds are required per FAR 28.102-1.
    • Contractors shall maintain liability insurance in the following amounts:
      • General Liability: $1,000,000 per occurrence.
      • Workers’ Compensation: As required by state law.
      • Automobile Liability: $500,000 per accident.

    8.8 Inspection and Acceptance

    • Work will be inspected by the Contracting Officer’s Representative (COR).
    • The Government reserves the right to reject non-conforming work and withhold payment until deficiencies are corrected.

    8.9 Buy American Act Compliance

    • Materials must comply with the Buy American Act (FAR 52.225-9) unless an exemption is approved.

    8.10 Dispute Resolution and Claims

    • Disputes shall be handled per FAR 52.233-1 (Disputes Clause).
    • The contractor must attempt to resolve disputes through negotiation before escalating to formal claims.

    Key dates

    1. February 18, 2026Posted Date
    2. March 13, 2026Proposals / Responses Due

    AI search tags

    Frequently asked questions

    REPLACE FIRE HYDRANT AT USCG AIR STATION CLEARWATER is a federal acquisition solicitation issued by DEPARTMENT OF HOMELAND SECURITY. Review the full description, attachments, and submission requirements on SamSearch before the response deadline.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.