Closed Solicitation · DEPT OF DEFENSE
AI Summary
The Department of Defense is seeking proposals for the restoration of stormwater infrastructure at Tyndall AFB. This project involves repairing degraded drainpipes and inlet structures to ensure proper drainage and mitigate safety hazards. The estimated project cost is between $5,000,000 and $10,000,000.
Purpose of this task order is to repair existing stormwater infrastructure (drainpipe and inlet structures) at selected areas within the Tyndall AFB main airfield. The existing stormwater infrastructure is in degraded condition and needs to be replaced to provide proper drainage and mitigate safety hazards associated with sinkholes noted by maintenance personnel on base. In accordance with FAR 36.204(g), the magnitude for this project is between $5,000,000 and $10,000,000.
RESTORATION OF NORTHWEST STORM DRAIN INFRASTRUCTURE is a federal acquisition solicitation issued by DEPT OF DEFENSE. Review the full description, attachments, and submission requirements on SamSearch before the response deadline.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.