Active Solicitation · DEPARTMENT OF ENERGY
AI Summary
The Fermi National Accelerator Laboratory is seeking information on the design, fabrication, and potential assembly and installation of a suspended work platform system for the MAGIS-100 experiment. This system is essential for safe personnel access in a vertical shaft at the Fermilab site. Responses are due by July 14, 2026, at 5 PM CT.
Fermi National Accelerator Laboratory (FNAL) is requesting information regarding the design, fabrication, and potential assembly and installation of a suspended work platform system that are needed to allow personnel to safely access regions of the MAGIS-100 experiment in a vertical shaft. The project is located on the Fermi National Accelerator Laboratory (Fermilab) Site, adjacent to the city of Batavia, Illinois.
For more detailed information, please review the attached SOW entitled, “MAGIS-100 Suspended Work Platform System.”
Responses are due 07/14/2026 at 5pm CT.
RFI FOR MAGIS-100 SUSPENDED WORK PLATFORM SYSTEM is a federal acquisition solicitation issued by DEPARTMENT OF ENERGY. Review the full description, attachments, and submission requirements on SamSearch before the response deadline.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.