Closed Solicitation · DEPARTMENT OF AGRICULTURE

    Rock Creek Road Maintenance

    Sol. 127EAX26Q0014Combined Synopsis/SolicitationSet-aside: Total Small Business Set-Aside (FAR 19.5)Albuquerque, NM
    Closed
    STATUS
    Closed
    closed Apr 10, 2026
    POSTED
    Mar 12, 2026
    Publication date
    NAICS CODE
    237310
    Primary industry classification
    PSC CODE
    Z1LB
    Product & service classification

    AI Summary

    The Department of Agriculture's Forest Service is seeking contractors for road maintenance activities in the Carson National Forest. The project includes various tasks such as drain dip construction, road widening, and culvert installation. The quote due date is April 10, 2026, at 1:00 PM CDT. Contractors may visit the site independently due to the cancellation of the scheduled site visit.

    Contract details

    Solicitation No.
    127EAX26Q0014
    Notice Type
    Combined Synopsis/Solicitation
    Set-Aside
    Total Small Business Set-Aside (FAR 19.5)
    Posted Date
    March 12, 2026
    Response Deadline
    April 10, 2026
    NAICS Code
    237310AI guide
    PSC / Class Code
    Z1LB
    Contract Code
    12C2
    Sub-Agency
    FOREST SERVICE
    Primary Contact
    Troy A. McCullough
    State
    NM
    ZIP Code
    871023498
    AI Product/Service
    service

    Description

    Amendment 0001 - 3/12/2026 The Purpose of Amendment 0001 is to: 1. Correct the quote due date discrepancy. Quote Due Date is April 10th, 2026 at 1:00 pm Central Daylight Time. 2. Remove Scheduled Site visit date. Due to current weather conditions at project location, there will not be a scheduled site visit. Contractors can visit the location on their own. The Carson National Forest is pursuing road maintenance activities to be accomplished on the Tres Piedras Ranger District. Base items include drain dip construction, road widening, curve widening, road obliteration, new construction, rip rap placement, road reconditioning, and culvert installation. Drain dip construction will involve excavation and compaction of approximately 180 cubic yards of native material. Road widening will involve approximately 1390 cubic yards of excavation and compaction and will result in total road widths of twelve (12) feet. New construction will involve 0.6 miles of clearing and grubbing and approximately 600 cubic yards of excavation and compaction. Road reconditioning will involve ditch maintenance, shoulder maintenance, roadbed maintenance, and aggregate surface maintenance where applicable. Lastly, culvert installation will involve the placement of a 57” x 38” arched corrugated metal pipe thirty (30) feet in length on top of approximately 30 cubic feet of uncompacted bedding material.

    Key dates

    1. March 12, 2026Posted Date
    2. April 10, 2026Proposals / Responses Due

    AI search tags

    Frequently asked questions

    Rock Creek Road Maintenance is a federal acquisition solicitation issued by DEPARTMENT OF AGRICULTURE. Review the full description, attachments, and submission requirements on SamSearch before the response deadline.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.