    ROSEBUD LIFT STATION CONSTRUCTION

    Sol. 75H70126R00030SolicitationSet-aside: Total Small Business Set-Aside (FAR 19.5)SEATTLE, WA
    Closed
    STATUS
    Closed
    closed Jul 20, 2026
    POSTED
    Jul 14, 2026
    Publication date
    NAICS CODE
    237110
    Primary industry classification
    PSC CODE
    Y1ND
    Product & service classification

    AI Summary

    The Department of Health and Human Services is soliciting proposals for the construction of the Rosebud Lift Station. This project involves the complete removal and replacement of the existing lift station to accommodate increased capacity and future expansion. The contract is set aside for small businesses, with a construction magnitude between $500,000 and $1,000,000.

    Contract details

    Solicitation No.
    75H70126R00030
    Notice Type
    Solicitation
    Set-Aside
    Total Small Business Set-Aside (FAR 19.5)
    Posted Date
    July 14, 2026
    Response Deadline
    July 20, 2026
    NAICS Code
    237110AI guide
    PSC / Class Code
    Y1ND
    Primary Contact
    Daniel Cotto
    State
    WA
    ZIP Code
    98121
    AI Product/Service
    service

    Description

    Amendment 2: Update the pump requirements. Refer to the SF-30 A02 Pump Specs RLSC.

    1. The purpose of this amendment is to add a geotechnical repost from 300 feet away from the site.
    2. Attachment J02a RB Geotech Report from 300 feet away is added.
    3. All other terms and conditions remain unchanged.

    Amendment 2: Update the pump requirements. Refer to the SF-30 A02 Pump Specs RLSC.

    1. The purpose of this solicitation amendment A02 is to:
    a. Update the pump requirements.
    2. Attachment J03 Tech Specs RLSC, paragraph 2.4 Sewage Pumps, F. Pump Performance Requirements is amended as follows:
    - Item 1. Capacity is changed from 95 gpm to 125 GPM .
    - Item 3. Total Dynamic head is changed from 63 feet to 80 feet .
    3. Remember to acknowledge all amendments. Block 11 of the SF-30 provides instructions for
    acknowledging amendments; it is acceptable to acknowledge on block 19 of the SF-1442.
    4. All other terms and conditions remain unchanged.

    ----------------------------------------------------------------------------

    Amendment 1: Add attachment J03a Plans RLSC and the corresponding SF-30.

    ----------------------------------------------------------------------------

    Request For Proposals (RFP)

    Rosebud Lift Station Construction

    75H70126R00030

    Set-Aside: Total Small Business set-aside.

    Product Service Code: Y1ND - Construction of Sewage And Waste Facilities

    NAICS Code: 237110 - Water and Sewer Line and Related Structures Construction

    • Size Stdr: $45 million

    Location: 1319 Soldier Creek Road, Rosebud, SD 57570 County: Todd

    POP: 240 calendar days

    Construction Magnitude: Between $500,000 and $1,000,000

    Contract Type: firm-fixed-priced

    TERO: TERO is applicable. See Section H.50.

    Goal: The existing lift station has been in place since the early 1990s. Since its creation the hospital anticipates increased expansion in the emergency department, added on Tribal programs (dialysis, detox, Tribal Health Administration Building), added on 19 more quarters units, and is anticipating adding an additional 23 quarters units. The existing pumps are facing replacement every 1-2 years due to the unanticipated growth, but due to the growth we need to consider increasing the capacity of the wet well. In addition to switching from standard submersible pumps to chopper pumps to accommodate the random objects that get flushed into the system. In July both pumps ended up failing and they had to not only replace the pumps but pay for sewage disposal to circumvent overflow.

    A separate project is in the works to begin remediating/replacing damaged sewer mains due to inflow and infiltration.

    This construction solicitation will require the full removal and replacement of the lift station for the Rosebud complex. The existing lift station provides wastewater service to the hospital quarters units, and several tribal program buildings. Once installation is complete the new lift station will take the full sanitary load for the area currently being serviced by the existing lift station and be sized to handle expansion in the future. Then the existing lift station consisting of the wet well, dry well, pumps and piping will be demolished. The new lift station will consist of a wet well, a dry well, installation of chopper pumps, and force main connection.  This project will also include a new control system to allow the facility to monitor flow into the lift station and the status of the equipment.

    Brand Names: Where brand names are referenced, they establish a standard of quality and performance. Offerors may propose equal products that meet or exceed the specified functional and performance requirements. The Government will evaluate equality based on technical compatibility, performance, and integration with the system.

    Primary Point of Contact:

    • Daniel Cotto
    • Email: daniel.cotto@ihs.gov
    • Phone Number: 2404617841

    Alternative Point of Contact: (Please don't add unless the primary is unavailable.)

    • Andrew E. Hart
    • Email: andrew.hart@ihs.gov
    • Phone Number: 206-375-4443

    Attachments: Refer to the Attachments section.

    Key dates

    1. July 14, 2026Posted Date
    2. July 20, 2026Proposals / Responses Due

    AI search tags

    Frequently asked questions

    ROSEBUD LIFT STATION CONSTRUCTION is a federal acquisition solicitation issued by DEPARTMENT OF HEALTH AND HUMAN SERVICES. Review the full description, attachments, and submission requirements on SamSearch before the response deadline.