Closed Solicitation · DEPT OF DEFENSE

    SAVANNAH HARBOR EXPANSION PROJECT (SHEP) 14A DIKE RAISING AND WEIR IMPROVEMENTS

    Sol. W912HN24B5004SolicitationSet-aside: Total Small Business Set-Aside (FAR 19.5)SAVANNAH, GA
    Closed
    STATUS
    Closed
    closed Jul 17, 2024
    POSTED
    Jun 13, 2024
    Publication date
    NAICS CODE
    237990
    Primary industry classification
    PSC CODE
    Z1KF
    Product & service classification

    AI Summary

    The Savannah Harbor Expansion Project (SHEP) 14A Dike Raising and Weir Improvements contract opportunity is available through the Department of Defense, Department of the Army, with a deadline of July 17, 2024, at 12:00 pm EDT. A site visit is scheduled for June 20, 2024, at 10:00 am at 99 Grand Prize of America, Savannah, GA 31401. For inquiries or to schedule an alternative site visit, please contact Jeremy Miller at 912-652-5192 (office) or 912-318-8146

    Contract details

    Solicitation No.
    W912HN24B5004
    Notice Type
    Solicitation
    Set-Aside
    Total Small Business Set-Aside (FAR 19.5)
    Posted Date
    June 13, 2024
    Response Deadline
    July 17, 2024
    NAICS Code
    237990AI guide
    PSC / Class Code
    Z1KF
    Contract Code
    2100
    Issuing Office
    W074 ENDIST SAVANNAH
    Primary Contact
    Amy Collins
    State
    GA
    ZIP Code
    31401-3604

    Award information

    Awardee
    null
    Award Date

    Description

    NOTE:  A site visit is scheduled for 20 June 2024 at 10:00 am. The address is 99 Grand Prize of America, Savannah, GA 31401. The POCs are Jeremy Miller 912-652-5192 (office)/912-318-8146 (cell) and Samantha Holzinger 912-652-6017 (office)/912-724-0676 (cell).   If you cannot make this one please reach out to these POCs to set up one if needed.  Savannah Harbor Expansion Project (SHEP) 14A Dike Raising and Weir Improvements - The existing back dike currently spans a length of approximately 11,000 feet and has a crest elevation ranging from about 27 to 29 feet mean lower low water (MLLW). The back dike will be raised to a uniform elevation of 33 feet MLLW. The existing front dike currently spans a length of approximately 6,400 feet and has a crest elevation ranging from about 25 to 27 feet MLLW. The front dike will be raised to a uniform elevation of 31 feet MLLW to gain additional capacity for containment of Savannah Harbor dredged material. Approximately 231,000 cubic yards of borrow material from the adjacent 14B DMCA will be required for the raising of the back dike and approximately 65,000 cubic yards for the front dike. Additional borrow materials from the adjacent 14B DMCA may be needed. Weir modifications for weirs 14A1, 14A2, and 14A3 are anticipated, as well as resetting the abutment on cross-dike weir 14A/B. The borrow material consists of dredge materials from the Savannah River. The dike construction will be performed to the inside of the existing dike crest and slope. Additional project requirements include clearing, grassing, and erosion control provisions.

    Key dates

    1. June 13, 2024Posted Date
    2. July 17, 2024Proposals / Responses Due

    Frequently asked questions

    SAVANNAH HARBOR EXPANSION PROJECT (SHEP) 14A DIKE RAISING AND WEIR IMPROVEMENTS is a federal contract award from DEPT OF DEFENSE. Review the award details including the awardee, contract value, and NAICS code.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.