Active Solicitation · DEPARTMENT OF TRANSPORTATION

    SD FTFW MADI 10(2) & 9000(1) REHAB MADISON WMD HQ ROAD

    Sol. 6982AF26B000008PresolicitationLAKEWOOD, CO
    Open · 1d remaining
    DAYS TO CLOSE
    1
    closes May 14, 2026
    POSTED
    Apr 29, 2026
    Publication date
    NAICS CODE
    237310
    Primary industry classification
    PSC CODE
    Y1LB
    Product & service classification

    AI Summary

    The project involves the rehabilitation of the Madison Wetland Management District Headquarters road, including pavement reconstruction and parking lot improvements. The work aims to enhance safety and mobility for visitors and staff, with an estimated cost between $501,000 and $1,000,000. The anticipated schedule includes advertisement in May 2026 and contract completion by October 2026.

    Contract details

    Solicitation No.
    6982AF26B000008
    Notice Type
    Presolicitation
    Posted Date
    April 29, 2026
    Response Deadline
    May 14, 2026
    NAICS Code
    237310AI guide
    PSC / Class Code
    Y1LB
    Primary Contact
    Douglas Whitcomb
    State
    CO
    ZIP Code
    80228
    AI Product/Service
    both

    Description

    THIS IS NOT AN INVITIATION FOR BID, PLAN AND SPECIFICATIONS ARE NOT AVAILBLE

    PROJECT NUMBER: SD FTFW MADI 10(2) & 9000(1)

    PROJECT NAME: REHAB MADISON WMD HQ ROAD

    PROJECT DESCRIPTION

    The scope of this project includes pavement reconstruction to the approach road and parking lot for the Madison Wetland Management District (WMD) Headquarters and the United States Fish and Wildlife Service (USFWS) Visitor Center. The designed pavement section is proposed to be 3.5 inches of asphalt concrete pavement (ACP) over 4 inches of aggregate base material. The proposed parking lot will be installed at grade with the adjacent sidewalk and concrete trail. The project will improve safety and mobility for staff and visitors by providing improved access to and parking for the Payne Waterfowl Production Area (WPA). The pavement improvements will also extend the service life of the access road and parking lot wearing surfaces.

    SCOPE OF THE WORK: 

    The existing two-way, single-lane operation of the access road will be preserved by constructing a consistent 14-foot roadway section. Pavement reconstruction will also address the approach road apron on the left side of the roadway between stations 106+02 and 106+74.

    The project also includes full reconstruction of the existing parking lot and the asphalt apron on its east side, which connects to the concrete trail leading to the visitor center’s east entrance. The updated pavement marking layout will provide eight 10-foot by 20-foot parking stalls with one accessible stall on the north side, and ten 10-foot by 20-foot stalls on the south side. The northern edge of the parking area will maintain its existing tie-in elevation with the 6-foot sidewalk, and the parking surface will be regraded to a uniform 1.75% cross slope, removing the existing centerline grade break.

    PRINCIPAL WORK ITEMS:

    • 20401-0000 Roadway Excavation: 550 CUYD
    • 20402-0000 Subexcavation: 200 CUYD
    • 30202-2000 Roadway Aggregate, Method 2: 600 TON
    • 40301-0000 Asphalt Concrete Pavement, 500 TON

    ANTICIPATED SCHEDULE: 

    Advertisement – May 2026

    Award – July 2026

    NTP – July 2026

    Contract Completion – October 2026

    ESTIMATED COST RANGE:  Total estimated cost between $501,000 and $1,000,000.

    Key dates

    1. April 29, 2026Posted Date
    2. May 14, 2026Proposals / Responses Due

    AI search tags

    Frequently asked questions

    SD FTFW MADI 10(2) & 9000(1) REHAB MADISON WMD HQ ROAD is a federal acquisition solicitation issued by DEPARTMENT OF TRANSPORTATION. Review the full description, attachments, and submission requirements on SamSearch before the response deadline.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.