Closed Solicitation · DEPT OF DEFENSE
AI Summary
The opportunity involves the rehabilitation of the Skagway River levee to restore its functionality following significant flooding. The project includes rebuilding the levee toe and side slopes with designated riprap gradation over approximately 6,000 linear feet. Construction wage rates will apply, and the project is set aside for SBA. Amendments have been posted for this solicitation.
Repair the Skagway River Levee to restore its functionality to the pre-disaster conditions it has sustained as a result of significant flooding events. The levee is located along the southeast bank of the Skagway River starting at the Klondike Highway Bridge in Skagway and was constructed between 1939-1940 with its original length being 6,700 feet. All but a roughly 1,300-foot portion of the levee was modified by DOT and PF in 2001, encapsulating the original levee and adding Class III and IV armor stone along the riverward side slopes. The levee protects public infrastructure as well as residential, commercial, and historical properties. Damage to the levee includes loss of riverward armor stone and toe width reduction. The aim of this project is to rebuild the levee toe and damaged side slopes with a USACE POA designated riprap gradation and a 1.5 horizontal ((H) to 1 vertical (V) side slope. The construction length is approximately 6,000 linear feet (LF). Construction wage rates (formerly Davis-Bacon Act wage rates) shall apply. Amendment 0001 posted 5 Nov 2025. Amendment 0002 posted 13 Nov 2025.
SKAGWAY RIVER LEVEE REHABILITATION OF DAMAGED FLOOD CONTROL WORKS, SKAGWAY, ALASKA is a federal acquisition solicitation issued by DEPT OF DEFENSE. Review the full description, attachments, and submission requirements on SamSearch before the response deadline.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.