Closed Solicitation · DEPARTMENT OF ENERGY

    SOURCES SOUGHT ANNOUNCEMENT-HEADGATE ROCK SUBSTATION MCGRAW EDISON POWER TRANSFORMER LOAD TAP CHANGER RETROFIT PROJECT

    DEPARTMENT OF ENERGY
    Sol. 26WA161605Sources SoughtPHOENIX, AZ
    Closed
    STATUS
    Closed
    closed Jul 13, 2026
    POSTED
    Jul 1, 2026
    Publication date
    NAICS CODE
    335311
    Primary industry classification
    PSC CODE
    R499
    Product & service classification

    AI Summary

    The Department of Energy is seeking capability statements for the Headgate Rock Substation McGraw Edison Power Transformer load tap changer retrofit project. This project involves a complete turnkey retrofit of the degraded oil-type load tap changer on the specified transformer. Interested parties should refer to the attachment for additional information.

    Contract details

    Solicitation No.
    26WA161605
    Notice Type
    Sources Sought
    Posted Date
    July 1, 2026
    Response Deadline
    July 13, 2026
    NAICS Code
    335311AI guide
    PSC / Class Code
    R499
    State
    AZ
    ZIP Code
    85009
    AI Product/Service
    service

    Description

    SOURCES SOUGHT NOTICE – Headgate Rock Substation McGraw Edison Power Transformer (Serial Number: C-05324-5-1) load tap changer (LTC) retrofit project

    This is a sources sought announcement only: The Department of Energy (DOE), Western Area Power Administration (WAPA), Desert Southwest (DSW) Region is seeking capability statements from all interested parties for the “Headgate Rock Substation McGraw Edison Power Transformer (Serial Number: C-05324-5-1) load tap changer (LTC) retrofit project- a complete turnkey retrofit of the degraded, legacy oil-type LTC on the active McGraw Edison Power Transformer (S/N: C-05324-5-1).

    Please refer to the attachment for additional informtion. 

    Key dates

    1. July 1, 2026Posted Date
    2. July 13, 2026Proposals / Responses Due

    AI search tags

    Frequently asked questions

    SOURCES SOUGHT ANNOUNCEMENT-HEADGATE ROCK SUBSTATION MCGRAW EDISON POWER TRANSFORMER LOAD TAP CHANGER RETROFIT PROJECT is a federal acquisition solicitation issued by DEPARTMENT OF ENERGY. Review the full description, attachments, and submission requirements on SamSearch before the response deadline.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.