Closed Solicitation · DEPT OF DEFENSE

    SOURCES SOUGHT - BRUNSWICK HARBOR MODIFICATIONS PROJECT, GLYNN COUNTY, GA.

    Sol. W912HN26BA009Sources SoughtSAVANNAH, GA
    Closed
    STATUS
    Closed
    closed Apr 23, 2026
    POSTED
    Apr 17, 2026
    Publication date
    NAICS CODE
    237990
    Primary industry classification
    PSC CODE
    Z1KF
    Product & service classification

    AI Summary

    The Savannah District Corps of Engineers is seeking market capabilities for the Brunswick Harbor Modifications Project in Glynn County, GA. This sources sought notice is for information only and does not obligate the Government to issue a solicitation. The project involves significant dredging and construction work, with an estimated cost between $10 million and $25 million.

    Contract details

    Solicitation No.
    W912HN26BA009
    Notice Type
    Sources Sought
    Posted Date
    April 17, 2026
    Response Deadline
    April 23, 2026
    NAICS Code
    237990AI guide
    PSC / Class Code
    Z1KF
    Issuing Office
    W074 ENDIST SAVANNAH
    Primary Contact
    Rohan Bryan
    State
    GA
    ZIP Code
    31401-3604
    AI Product/Service
    service

    Description

    The Savannah District Corps of Engineers is requesting information regarding the market capabilities of potential contractors that can perform Brunswick Harbor Modifications Project located in Glynn County, GA.

    This request does not obligate the Government in any way to post a solicitation or award a contract. Information received will be considered for the purpose of market research and determining how to best move forward with the procurement. Applicable NAICS is 237990 with a size 37 million. The potential magnitude for this requirement, per DFARS 236.204(i), is estimated between $10,000,000 and $25,000,000 dollars. Inquiry will only be accepted via email to Contract Specialist, Mr. Rohan Bryan at rohan.a.bryan@usace.army.mil, or Contracting Officer, Mr. Chad Arnett at chad.a.arnett@usace.army.mil. The request for Information Sheet should be completed and submitted no later than April 23, 2026, at 3:00 pm, Eastern Standard Time (EST).

    THIS IS NOT A SOLICITATION. THIS POSTING IS A SOURCES SOUGHT NOTICE ONLY.

    The scope of work includes the expansion of the Cedar Hammock Range bend widener located between stations 20+300 and 23+300. The bend widener is expected to be expanded by a maximum of 321 feet on the north side and to a length of approximately 2,700 feet. The bend widener will be dredged to a depth of -38 feet (-36 feet plus 2 feet of allowable overdepth dredging). Approximately 205,000 cubic yards of dredged material is anticipated to be removed to expand the bend widener and placed on a Beneficial Use site at Jekyll Island.

    Additionally, the scope of work also includes the expansion of the turning basin at Colonel’s Island Terminal along approximately 4,100 feet, which will increase the width by a maximum of 395 feet along the South Brunswick River from stations 0+900 to 5+300 and to a depth of -38 feet (-36 feet plus 2 feet of allowable overdepth dredging). Approximately 346,000 cubic yards of dredged material is anticipated to be removed to expand the bend widener and placed at the Andrew’s Island DMCA.

    Key dates

    1. April 17, 2026Posted Date
    2. April 23, 2026Proposals / Responses Due

    AI search tags

    Frequently asked questions

    SOURCES SOUGHT - BRUNSWICK HARBOR MODIFICATIONS PROJECT, GLYNN COUNTY, GA. is a federal acquisition solicitation issued by DEPT OF DEFENSE. Review the full description, attachments, and submission requirements on SamSearch before the response deadline.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.