Active Solicitation · DEPARTMENT OF COMMERCE
AI Summary
The Department of Commerce is seeking a contractor for the Steam Tunnel Ventilation Replacement project at NIST in Boulder, CO. This 100% Small Business Set-Aside project involves replacing the existing ventilation system with new natural gas indirect fired make up air units. The work is scheduled to occur between May 1 and October 31, ensuring safe and reliable operation.
June 18, 2026 - Published AMD 0001 Minor Changes SEE ATTACHMENTS FOR FULL PROJECT DETAILS Project: Construction Services/Steam Tunnel Ventilation System Replacement, NIST, Boulder, CO This acquisition is a 100% Small Business Set-Aside. The NAICS for this acquisition is 236220; the Small Business Size Standard is $45.0 Million. The purpose of this project is to replace the existing tunnel ventilation system with steam heating coils with (2) natural gas indirect fired make up air units (MAUs). This construction effort will procure and deliver a complete, operational tunnel ventilation system, including removal of existing equipment, installation MAUs, and all associated systems required for safe, reliable, and continuous ventilation system. Work will be planned and phased to be performed between the months of May 1 through October 31, mitigating the chances for pipes to freeze.
Steam Tunnel Ventilation Replacement is a federal acquisition solicitation issued by DEPARTMENT OF COMMERCE. Review the full description, attachments, and submission requirements on SamSearch before the response deadline.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.