Closed Solicitation · DEPT OF DEFENSE

    TENKILLER REPLACE DRAFT TUBE BULKHEADS AND LIFTING BEAM

    Sol. W912BV24R0100PresolicitationTULSA, OK
    Closed
    STATUS
    Closed
    closed Apr 3, 2024
    POSTED
    Mar 20, 2024
    Publication date
    NAICS CODE
    237990
    Primary industry classification
    PSC CODE
    Z1KA
    Product & service classification

    AI Summary

    The Department of Defense, specifically the Department of the Army, has issued a pre-solicitation notice for the Tenkiller Replace Draft Tube Bulkheads and Lifting Beam project at Tenkiller Ferry Powerhouse in Sequoyah County, Oklahoma. The project involves the construction of draft tube bulkheads and a lifting beam. Please note that this is not a solicitation for proposals, and no contract will be awarded based on this notice. The deadline for this opportunity is April 3, 2024, at 2:00 AM EST.

    Contract details

    Solicitation No.
    W912BV24R0100
    Notice Type
    Presolicitation
    Posted Date
    March 20, 2024
    Response Deadline
    April 3, 2024
    NAICS Code
    237990AI guide
    PSC / Class Code
    Z1KA
    Contract Code
    2100
    Issuing Office
    W076 ENDIST TULSA
    Primary Contact
    Tyler Godwin
    City
    TULSA
    State
    OK
    ZIP Code
    74137-4290

    Description

    Pre-solicitation Notice For Tenkiller Replace Draft Tube Bulkheads and Lifting Beam Tenkiller Ferry Powerhouse, Sequoyah County, OK This is a PRE-SOLICITATION NOTICE for the construction of the Tenkiller Replace Draft Tube Bulkheads and Lifting Beam project, at Tenkiller Ferry Powerhouse, Sequoyah County, Oklahoma. THIS IS NOT A SOLICITATION FOR PROPOSALS AND NO CONTRACT WILL BE AWARDED FROM THIS SYNOPSIS.  No reimbursement will be made for any costs associated with providing information in response to this pre-solicitation notice or any follow up postings. The U.S. Army Corps of Engineers – Tulsa District has been tasked to solicit for and award construction project for the Tenkiller Replace Draft Tube Bulkheads and Lifting Beam project, at Tenkiller Ferry Powerhouse. This project will be an Unrestricted, firm-fixed price, construction contract procured in accordance with FAR 15, Negotiated Procurement utilizing the Lowest Price Technically Acceptable approach. Project Description: Tenkiller Ferry Dam is a multipurpose facility located on the Illinois River in Sequoyah County, Oklahoma.  The earth-fill dam is primarily focused on providing flood control, recreation, and hydropower. The project is located approximately seven miles northeast of Gore, OK. The power plant contains two Francis-type generating units each rated 20,579 kVA at 0.95 pf. Construction of the site was completed in 1952 and is remotely operated from Fort Gibson powerhouse. The plant has an intake structure located over the rock cliff, approximately 750 feet away from the powerhouse.  On the downstream side of the powerhouse, draft tube bulkheads are located outside the facility on the tailrace deck.  Each turbine unit has two gate slots, and the Project has two draft tube bulkheads in total.  A monorail mounted on the exterior wall of the powerhouse with a single 10 ton trolley hoist is used to set the draft tube bulkheads. The work includes but is not limited to: Fabrication, painting, delivery, installation, and testing (operational and leakage) of two (2) new draft tube bulkheads.  Bulkheads have a nominal size of 16’-4” wide by 10’ high, fabricated to comply with HSS standards and coated with 5-E-Z vinyl coating system. Design, fabrication, painting, delivery, installation, and testing of one (1) new draft tube bulkhead lifting beam. Removal and disposal of two (2) existing draft tube bulkheads and one (1) existing draft tube bulkhead lifting beam. In accordance with FAR 36 and DFARS 236, the estimated magnitude of construction for this project is between $1,000,000 and $5,000,000. The North American Industry Classification System code for this procurement is 237990 (Other Heavy and Civil Engineering Construction) which has a small business size standard of $45M.  Estimated duration of construction of this project is 365 calendar days. Anticipated solicitation issuance date is on or about 03 April 2024, and the estimated proposal due date will be on or about 08 May 2024.

    Key dates

    1. March 20, 2024Posted Date
    2. April 3, 2024Proposals / Responses Due

    Frequently asked questions

    TENKILLER REPLACE DRAFT TUBE BULKHEADS AND LIFTING BEAM is a federal acquisition solicitation issued by DEPT OF DEFENSE. Review the full description, attachments, and submission requirements on SamSearch before the response deadline.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.