Closed Solicitation · DEPARTMENT OF TRANSPORTATION
AI Summary
The Federal Aviation Administration is seeking sources for tile replacement at the Lubbock, TX Air Traffic Control Tower (LBB ATCT). The project involves removing and replacing approximately 3,900 square feet of a raised floor system and installing a compliant electrical grounding system. Additionally, about 125 square feet of carpet flooring will be replaced in a ground-level office. Interested bidders should refer to the contract documents for further details.
The specifications, includes but is not limited to, the following: Removal and replacement of a ground level access (raised) floor system at LBB ATCT. Installation of a proper electrical grounding system for the access floor system at LBB ATCT compliant with FAA-STD-019G (see Appendix C). The total area of access flooring required to be removed and replaced is approximately 3,900 square feet. Removal and replacement of approximately 125 square feet of carpet floor finish on an existing access floor system in a ground level office at the LBB ATCT and other Work indicated in the Contract Documents.
Tile replacement at LBB ATCT (Lubbock, TX) is a federal acquisition solicitation issued by DEPARTMENT OF TRANSPORTATION. Review the full description, attachments, and submission requirements on SamSearch before the response deadline.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.