Closed Solicitation · DEPARTMENT OF ENERGY
AI Summary
The U.S. Department of Energy is seeking Expressions of Interest from qualified vendors for transformer replacement services at the Idaho National Laboratory. The project includes removal of the existing transformer, installation of a new one, and associated civil work. Interested vendors should submit their qualifications by April 3, 2026, to be considered for a future RFP.
INTRODUCTION
Battelle Energy Alliance, LLC (BEA) Management & Operating Contractor of the U.S. Department of Energy (DOE) owned Idaho National Laboratory (INL), is seeking an Expression of Interest (EOI) from qualified vendors to provide services for transformer replacement at the Specific Manufacturing Capability (SMC) facility, including associated duct bank and sewer work. This initiative supports BEA’s commitment to maintaining reliable electrical infrastructure and facility integrity
BACKGROUND
The SMC facility requires replacement of an existing transformer and related civil work to ensure safe and efficient power distribution. The scope of work may include the following:
INL is a U.S. Department of Energy (DOE) national laboratory dedicated to nuclear energy, national security, and clean energy innovation. INL is operated under a management and operating contract with the Department of Energy and as such, the Davis-Bacon Act applies for contracts in excess of $2,000 for the construction, alteration, or repair (including painting and decorating) of buildings or works at INL. Construction work at the laboratory Site covered under the Davis-Bacon Act is additionally subject to the INL Site Stabilization Agreement (SSA). These Site areas include all areas within the 890-square mile boundary, including the Material and Fuels Complex, Central Facilities Area, Advanced Test Reactor, Radioactive Waste Management Complex, and Specific Manufacturing Capability. The agreement is between signatory contractors and labor unions performing such work. Information regarding the INL Site Stabilization Agreement is available from the Site Labor Coordinator at (208) 524-4404 or at lance@sitelabor.org. Construction work performed at Idaho Falls facilities is not subject to these agreements.
PROCESS
This EOI is the first step in identifying interested and qualified vendors. Responses may be used to inform the development of a formal solicitation list. Selected vendors may be invited to participate in a Request for Proposal (RFP) process for award consideration.
SUBMITTAL REQUIREMENTS
Interested vendors should submit an Expression of Interest that includes the following:
Deadline for submission: April 3, 2026
Submit to: Chase.Egbert@inl.gov
Only select respondents, as determined by BEA, will receive an invitation to participate in the anticipated RFP solicitation.
PROPRIETARY INFORMATION
Because information received in response to this EOI may be business sensitive or proprietary to the responding party, respondents must mark information in their responses accordingly.
TRANSFORMER REPLACEMENT is a federal acquisition solicitation issued by DEPARTMENT OF ENERGY. Review the full description, attachments, and submission requirements on SamSearch before the response deadline.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.