Active Solicitation · DEPT OF DEFENSE
AI Summary
This opportunity involves a $1.7 billion two-phase design-build/design-bid-build multiple award task order contract for the construction of the Ground Based Strategic Deterrent Utility Corridor at Francis E. Warren Air Force Base in Wyoming. Vendors must register in the required systems to access controlled unclassified information and submit proposals.
21 May 2026: Reference Amendment 0003 to view the Site Visit Attendance List GBSD Utility Corridor 20May26.
$1.7B UNR TWO-PHASE DB/DBB MATOC FOR CONSTRUCTION OF THE GBSD UTLITY CORRIDOR AT F. E. WARREN AFB, WY. Reference Section 00 00 00 Procurement and Contracting Requirements for additional not included on the SF 1442 description. The Phase Two Seed Project Specifications and Drawings contain Controlled Unclassified Information and instructions to request access to these documents are located in Section 00 00 00. Vendors must be registered in both System for Award Management and Procurement Integrity Enterprise Environment to obtain approval for access to all CUI documents and submit proposals. Reference Solicitation Section 00 22 10 for registration instructions to access these systems. Reference the Solicitation for compliance with NIST and Cybersecurity Maturity Model Certification requirements as it pertains to this acquisition.
TWO PHASE DESIGN-BUILD/DESIGN-BID-BUILD (DB/DBB) MULTIPLE AWARD TASK ORDER CONTRACT (MATOC) FOR CONSTRUCTION OF THE GROUND BASED STRATEGIC DETERRENT (GBSD) UTILITY CORRIDOR (UC) AT FRANCIS E. WARREN AIR FORCE BASE (FEW AFB), WYOMING (WY) is a federal acquisition solicitation issued by DEPT OF DEFENSE. Review the full description, attachments, and submission requirements on SamSearch before the response deadline.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.