    UNDERGROUND STORAGE TANK (UST) REMOVAL AT STOCKTON LAKE PROJECT, STOCKTON, MO

    Sol. W912DQ25Q1007Combined Synopsis/SolicitationSet-aside: Total Small Business Set-Aside (FAR 19.5)KANSAS CITY, MO
    Closed
    STATUS
    Closed
    closed Dec 20, 2024
    POSTED
    Dec 5, 2024
    Publication date
    NAICS CODE
    562910
    Primary industry classification
    PSC CODE
    F109
    Product & service classification

    AI Summary

    The Department of Defense, specifically the Department of the Army, has issued a combined synopsis/solicitation for the removal of underground storage tanks (USTs) at Stockton Lake, Missouri. The project involves the complete removal of one 1500-gallon and one 1000-gallon UST, including the termination and safe handling of all associated connections, removal of concrete, piping, ancillary equipment, dispensing pumps, vent pipes, and a monitoring system, as well as the proper disposal of any remaining product and waste materials in compliance with state and federal regulations. An amendment has been made to the Performance Work Statement (P

    Contract details

    Solicitation No.
    W912DQ25Q1007
    Notice Type
    Combined Synopsis/Solicitation
    Set-Aside
    Total Small Business Set-Aside (FAR 19.5)
    Posted Date
    December 5, 2024
    Response Deadline
    December 20, 2024
    NAICS Code
    562910AI guide
    PSC / Class Code
    F109
    Contract Code
    2100
    Primary Contact
    Angella Curran
    State
    MO
    ZIP Code
    64106-2896

    Award information

    Awardee
    null
    Award Date

    Description

    Amendment 01 - an amendment has been made to the Performance Work Statement (PWS) in Section C of the solicitation. Please see the attached Solicitation Amendment document. Two Q&A Documents have also been attached. The complete removal of one (1) 1500 gallon and one (1) 1000 gallon Underground Storage Tanks (USTs), to terminate and make safe all associated connections, the removal of concrete, piping, ancillary equipment, dispensing pumps, vent pipes, 250i Interstitial Tank Veeder-Root monitoring system (if still in place), control console, the plugging of all lines going to and from the tanks, the proper removal all remaining product in tanks, the cleaning and disposal of tanks, laboratory testing, providing reports required by regulatory agencies, the disposal of waste materials or any contaminants to the requirements of State and Federal Regulations. The asphalt edge adjacent to the concrete shall be saw cut to create a linear smooth edge. Contractor is responsible for any damage caused during removal. The hole from the tanks will be secured and left open until satisfactory sample results have come back. Contractor will backfill and compact the disturbed area. All work areas must be left clean free of debris when complete. See solicitation document Section C, Performance Work Statement (PWS) for all specifications. See Section L for Submission instructions and site visit information.B.08.03 Questions and Answers #1 has been added to attachments.

    Key dates

    1. December 5, 2024Posted Date
    2. December 20, 2024Proposals / Responses Due

    Frequently asked questions

    UNDERGROUND STORAGE TANK (UST) REMOVAL AT STOCKTON LAKE PROJECT, STOCKTON, MO is a federal contract award from DEPT OF DEFENSE. Review the award details including the awardee, contract value, and NAICS code.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.