    UPPER BAKER INSTALLING TRAILER PADS AND UTILITIES

    Sol. 1240LT26Q0126Combined Synopsis/SolicitationSet-aside: Total Small Business Set-Aside (FAR 19.5)PRICE, UT
    Open · 28d remaining
    DAYS TO CLOSE
    28
    closes Aug 10, 2026
    POSTED
    Jul 7, 2026
    Publication date
    NAICS CODE
    237110
    Primary industry classification
    PSC CODE
    S119
    Product & service classification

    AI Summary

    The Department of Agriculture's Forest Service is seeking contractors for the installation of utility lines and connections to trailer pads, including water, sewer, and electrical services. The project requires compliance with state codes and includes optional trenching and gravel installation. Bidders must manage communications and permits with utility companies.

    Contract details

    Solicitation No.
    1240LT26Q0126
    Notice Type
    Combined Synopsis/Solicitation
    Set-Aside
    Total Small Business Set-Aside (FAR 19.5)
    Posted Date
    July 7, 2026
    Response Deadline
    August 10, 2026
    NAICS Code
    237110AI guide
    PSC / Class Code
    S119
    Sub-Agency
    FOREST SERVICE
    Primary Contact
    Derrick A Dodson
    City
    PRICE
    State
    UT
    ZIP Code
    84501
    AI Product/Service
    service

    Description

    This contract is comprised of installing utility lines, connections to existing lines and connections to trailer pads. Utilities included are electrical, water and sewer. Option items included are trenching, providing and spreading gravel and installation of an asphalt apron. Water and Sewer lines and connections must be kept 10ft apart. Contractor must work with and is responsible for all communications, supplies and permits with utility companies associated. All utilities will be installed in compliance with State and/or San Juan County code.

    Utilities –

    Water - The new water line will be connected to the existing water line between the meter and bunkhouse. Main water line will remain same size as existing line. Existing line is a 2” poly line. New water line will be a 2” HDPE blue Poly and connect to existing. One stop and waste to be installed within 5ft of new and existing line connection.

    Sewer – The new sewer line will be connected to the existing sewer line at the bunkhouse. Main line will be 6” with trailer connections being 6” to 3” Wye’s. Drainage must remain between 1/8” – ¼” per ft across the entirety of the line. Must meet state code.

    Electrical – A transformer and drop-down meter will need to be coordinated and installed with Empire Electric and conduit and wiring ran from meter to the trailer pads. Contractor will be responsible for determining sizing of conduit and wiring. Must meet state code.

    Option Items –

    Trenching and Backfilling – Trenching will need to be 36” deep to meet frost line requirements.

                          Crushed Aggregate – Grade G Road Base for the trailer pads and roadway

    Key dates

    1. July 7, 2026Posted Date
    2. August 10, 2026Proposals / Responses Due

    AI search tags

    Frequently asked questions

    UPPER BAKER INSTALLING TRAILER PADS AND UTILITIES is a federal acquisition solicitation issued by DEPARTMENT OF AGRICULTURE. Review the full description, attachments, and submission requirements on SamSearch before the response deadline.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.