    USACE MOUTH OF COLORADO MAINTENANCE DREDGING WITH SARGENT BEACH, BENEFICIAL USE, BREAKWATERS, AND BEACH PLACEMENT, MATAGORDA COUNTY, TEXAS

    Sol. W912HY25RA001PresolicitationGALVESTON, TX
    Closed
    STATUS
    Closed
    closed Jul 21, 2025
    POSTED
    Jun 3, 2025
    Publication date
    NAICS CODE
    237990
    Primary industry classification
    PSC CODE
    Z1KF
    Product & service classification

    AI Summary

    The U.S. Army Corps of Engineers is seeking bids for maintenance dredging at the Mouth of Colorado in Matagorda County, Texas. The project involves dredging approximately 876,000 cubic yards and includes the construction of a terminal groin and four nearshore breakwaters at Sargent Beach. The estimated duration is 490 days, with options for beneficial use beach placement and additional breakwater construction, potentially extending the timeline by up to 80 days.

    Contract details

    Solicitation No.
    W912HY25RA001
    Notice Type
    Presolicitation
    Posted Date
    June 3, 2025
    Response Deadline
    July 21, 2025
    NAICS Code
    237990AI guide
    PSC / Class Code
    Z1KF
    Primary Contact
    Christy Slater
    State
    TX
    ZIP Code
    77550-1229
    AI Product/Service
    service

    Description

    Schedule 1 – Project is for Shallow Draft Maintenance Pipeline Dredging of the Mouth of Colorado Entrance Jetty Channel and Detention Basin and will include varying advanced maintenance and 2’ over-depth. Schedule 1 includes dredging of approximately 876,000 cubic yards (CY). Material will be placed west of West/South Jetty in nearshore zone; Construction of Terminal Groin and 4 of the 5 planned nearshore breakwaters at Sargent Beach, 25 miles East of the Mouth of Colorado. Estimated duration is 490 calendar days. Option 1 includes Beneficial Use beach placement of dredged material along the breakwater beach area of Sargent Beach, 25 miles East of the Mouth of the Colorado. Additional time of 40 calendar days. Option 2 includes Beneficial Use placement of dredged material along Sargent Beach’s historic stretch area, 25 miles East of the Mouth of the Colorado. Additional time of 10 calendar days. Option 3 includes construction of the 5th nearshore breakwater with the planned construction of the four (4) nearshore breakwaters aligned with the West coastline of Sargent Beach. Additional time of 30 calendar days.

    Key dates

    1. June 3, 2025Posted Date
    2. July 21, 2025Proposals / Responses Due

    AI search tags

    Frequently asked questions

    USACE MOUTH OF COLORADO MAINTENANCE DREDGING WITH SARGENT BEACH, BENEFICIAL USE, BREAKWATERS, AND BEACH PLACEMENT, MATAGORDA COUNTY, TEXAS is a federal acquisition solicitation issued by DEPT OF DEFENSE. Review the full description, attachments, and submission requirements on SamSearch before the response deadline.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.